IAC logo
IAC Assessment: LE0205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2005
Principal Product Metal Heat Treating Service
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 31,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 4,680
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,201 1,128,642 kWh $0.04
Electricity Demand $45,870 4,259 kW-months/year $10.77
Natural Gas $104,649 14,980 MMBtu $6.99
TOTAL ENERGY COSTS $196,720
RECOMMENDED SAVINGS* $91,439 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,777
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$65,962
Cost:
$35,000
- - - - - - - - $65,962 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$65,962
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,462
Cost:
$15,000
- - - - - - $15,462 2,212 - - -
-
kWh
-
-
kW-months/year
-
-
$
$15,462
2,212
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,673
Cost:
$5,050
- - - - $4,673 - - - - - -
-
kWh
-
-
kW-months/year
$4,673
-
$
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,294
Cost:
$2,500
- - $2,294 213 - - - - - - -
-
kWh
$2,294
213
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,527
Cost:
$300
$1,527 37,240 - - - - - - - - $1,527
37,240
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,521
Cost:
$150
$918 21,851 $603 56 - - - - - - $918
21,851
kWh
$603
56
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$91,439
Cost:
$58,000
$2,445 59,091 $2,897 269 $4,673 - $15,462 2,212 $65,962 - $2,445
59,091
kWh
$2,897
269
kW-months/year
$4,673
-
$
$15,462
2,212
MMBtu
$65,962
-
$
TOTAL IMPLEMENTED Savings:
$69,777
Cost:
$37,650
$918 21,851 $2,897 269 - - - - $65,962 - $918
21,851
kWh
$2,897
269
kW-months/year
-
-
$
-
-
MMBtu
$65,962
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product