IAC logo
IAC Assessment: LE0220
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0220
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2005
Principal Product Commercial entrances, windows, and storefront systems
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $5,000,000-$10,000,000
# of Employees 49
Plant Area (Sq.Ft.) 88,000
Annual Production 7,000 Pieces
Production Hrs. Annual 2,080
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,296 412,613 kWh $0.09
Electricity Demand $11,683 1,863 kW-months/year $6.27
Natural Gas $73,307 6,998 MMBtu $10.48
TOTAL ENERGY COSTS $121,286
RECOMMENDED SAVINGS* $25,519 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,767
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$13,454
Cost:
$18,500
- - - - $13,454 1,284 -
-
kWh
-
-
kW-months/year
$13,454
1,284
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,586
Cost:
$500
$5,411 60,120 $2,175 347 - - $5,411
60,120
kWh
$2,175
347
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$594
Cost:
$450
$449 4,990 $145 45 - - $449
4,990
kWh
$145
45
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$377
Cost:
$80
$258 2,871 $119 19 - - $258
2,871
kWh
$119
19
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$298
Cost:
$450
$298 3,309 - - - - $298
3,309
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,210
Cost:
$25,315
$2,281 25,339 $929 148 - - $2,281
25,339
kWh
$929
148
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$25,519
Cost:
$45,295
$8,697 96,629 $3,368 559 $13,454 1,284 $8,697
96,629
kWh
$3,368
559
kW-months/year
$13,454
1,284
MMBtu
TOTAL IMPLEMENTED Savings:
$11,767
Cost:
$26,345
$8,399 93,320 $3,368 559 - - $8,399
93,320
kWh
$3,368
559
kW-months/year
-
-
MMBtu