IAC logo
IAC Assessment: LE0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2005
Principal Product Pharmaceuticals
NAICS 325411 - Medicinal and Botanical Manufacturing
SIC 2833 - Medicinals And Botanicals
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 32,000
Annual Production 22 Pounds
Production Hrs. Annual 2,500
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,656 2,089,440 kWh $0.09
Electricity Demand $34,230 5,038 kW-months/year $6.79
Natural Gas $103,182 9,421 MMBtu $10.95
TOTAL ENERGY COSTS $322,068
RECOMMENDED SAVINGS* $38,897 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,632
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$20,632
Cost:
$500
- - - - $20,632 - - - -
-
kWh
-
-
kW-months/year
$20,632
-
MMBtu
-
-
Tgal
02: 2.7314 REDUCE VENTILATION AIR Savings:
$6,676
Cost:
$200
$6,676 75,862 - - - - - - $6,676
75,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$4,200
Cost:
$200
- - $4,200 619 - - - - -
-
kWh
$4,200
619
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,761
Cost:
$6,000
- - - - $3,761 344 - - -
-
kWh
-
-
kW-months/year
$3,761
344
MMBtu
-
-
Tgal
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,628
Cost:
$500
$328 3,730 - - - - $3,300 - $328
3,730
kWh
-
-
kW-months/year
-
-
MMBtu
$3,300
-
Tgal
TOTAL RECOMMENDED Savings:
$38,897
Cost:
$7,400
$7,004 79,592 $4,200 619 $24,393 344 $3,300 - $7,004
79,592
kWh
$4,200
619
kW-months/year
$24,393
344
MMBtu
$3,300
-
Tgal
TOTAL IMPLEMENTED Savings:
$20,632
Cost:
$500
- - - - $20,632 - - - -
-
kWh
-
-
kW-months/year
$20,632
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption