IAC logo
IAC Assessment: LE0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2005
Principal Product Vinyl Windows and Doors
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 102,950
Annual Production 160,000 Pieces
Production Hrs. Annual 2,550
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,708 1,396,080 kWh $0.05
Electricity Demand $61,082 5,908 kW-months/year $10.34
Natural Gas $15,176 1,638 MMBtu $9.26
TOTAL ENERGY COSTS $148,966
RECOMMENDED SAVINGS* $127,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 4.451 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$96,000
Cost:
$5,000
- - - - - - - - $96,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$96,000
-
%
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$13,410
Cost:
$49,000
$6,296 121,088 $7,114 688 - - - - - - $6,296
121,088
kWh
$7,114
688
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$5,760
Cost:
$5,100
- - - - - - $5,760 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,760
-
$
-
-
%
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,048
Cost:
$2,000
- - $3,048 295 - - - - - - -
-
kWh
$3,048
295
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,793
Cost:
$815
$2,793 53,712 - - - - - - - - $2,793
53,712
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,752
Cost:
$200
$1,050 20,199 $702 68 - - - - - - $1,050
20,199
kWh
$702
68
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,714
Cost:
$7,800
- - - - $1,714 238 - - - - -
-
kWh
-
-
kW-months/year
$1,714
238
MMBtu
-
-
$
-
-
%
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$513
Cost:
$480
$513 9,861 - - - - - - - - $513
9,861
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,823
Cost:
$500
$1,458 28,050 $1,365 132 - - - - - - $1,458
28,050
kWh
$1,365
132
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$127,813
Cost:
$70,895
$12,110 232,910 $12,229 1,183 $1,714 238 $5,760 - $96,000 - $12,110
232,910
kWh
$12,229
1,183
kW-months/year
$1,714
238
MMBtu
$5,760
-
$
$96,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production