Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2006 |
Principal Product | fatty acid esters |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 92 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 28,000,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $394,912 | 7,445,541 | kWh | $0.05 |
Electricity Demand | $69,754 | 10,559 | kW-months/year | $6.61 |
Natural Gas | $3,033,754 | 260,943 | MMBtu | $11.63 |
TOTAL ENERGY COSTS | $3,498,420 | |||
RECOMMENDED SAVINGS* | $487,139 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $304,400 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $154,145 Cost: $75,000 |
- | - | - | - | $136,373 | 11,726 | $10,781 | 5,000,000 | $6,991 | - |
- - kWh |
- - kW-months/year |
$136,373 11,726 MMBtu |
$10,781 5,000,000 gal |
$6,991 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $109,146 Cost: $363,000 |
$221,137 | 4,172,400 | $43,626 | 6,600 | $(-155,617) | - | - | - | - | - |
$221,137 4,172,400 kWh |
$43,626 6,600 kW-months/year |
$(-155,617) - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $81,919 Cost: $51,275 |
- | - | - | - | $81,919 | 7,044 | - | - | - | - |
- - kWh |
- - kW-months/year |
$81,919 7,044 MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $64,647 Cost: $2,500 |
- | - | - | - | $64,647 | 5,559 | - | - | - | - |
- - kWh |
- - kW-months/year |
$64,647 5,559 MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $50,061 Cost: $47,500 |
$42,619 | 804,126 | $7,442 | 1,126 | - | - | - | - | - | - |
$42,619 804,126 kWh |
$7,442 1,126 kW-months/year |
- - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $14,515 Cost: $800 |
- | - | - | - | $14,515 | 1,248 | - | - | - | - |
- - kWh |
- - kW-months/year |
$14,515 1,248 MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $8,946 Cost: $16,000 |
- | - | $8,946 | 1,353 | - | - | - | - | - | - |
- - kWh |
$8,946 1,353 kW-months/year |
- - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,760 Cost: $500 |
$3,200 | 60,393 | $560 | 85 | - | - | - | - | - | - |
$3,200 60,393 kWh |
$560 85 kW-months/year |
- - MMBtu |
- - gal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $487,139 Cost: $556,575 |
$266,956 | 5,036,919 | $60,574 | 9,164 | $141,837 | 25,577 | $10,781 | 5,000,000 | $6,991 | - | $266,956 5,036,919 kWh |
$60,574 9,164 kW-months/year |
$141,837 25,577 MMBtu |
$10,781 5,000,000 gal |
$6,991 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $304,400 Cost: $175,075 |
$45,819 | 864,519 | $8,002 | 1,211 | $232,807 | 20,018 | $10,781 | 5,000,000 | $6,991 | - | $45,819 864,519 kWh |
$8,002 1,211 kW-months/year |
$232,807 20,018 MMBtu |
$10,781 5,000,000 gal |
$6,991 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Water Consumption |