IAC Assessment: LE0231
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0231
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2006
Principal Product Corrugated Cardboard Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 150,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $394,838 4,967,500 kWh $0.08
Electricity Demand $77,008 12,792 kW-months/year $6.02
Natural Gas $333,080 52,193 MMBtu $6.38
TOTAL ENERGY COSTS $804,926
RECOMMENDED SAVINGS* $412,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $121,625
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$140,853
Cost:
$660,000
$295,776 3,744,000 $43,344 7,200 - - $(-198,267) - - - $295,776
3,744,000
kWh
$43,344
7,200
kW-months/year
-
-
$
$(-198,267)
-
MMBtu
-
-
lb
02: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$128,263
Cost:
$120,000
$9,811 124,188 $1,926 320 - - $8,326 1,305 $108,200 - $9,811
124,188
kWh
$1,926
320
kW-months/year
-
-
$
$8,326
1,305
MMBtu
$108,200
-
lb
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$29,942
Cost:
$13,500
$26,115 330,575 $3,827 636 - - - - - - $26,115
330,575
kWh
$3,827
636
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$26,565
Cost:
$51,000
$5,780 73,162 $847 141 $19,938 - - - - - $5,780
73,162
kWh
$847
141
kW-months/year
$19,938
-
$
-
-
MMBtu
-
-
lb
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$21,498
Cost:
$4,500
- - - - - - $21,498 3,370 - - -
-
kWh
-
-
kW-months/year
-
-
$
$21,498
3,370
MMBtu
-
-
lb
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$17,212
Cost:
$12,500
- - - - - - $17,212 2,698 - - -
-
kWh
-
-
kW-months/year
-
-
$
$17,212
2,698
MMBtu
-
-
lb
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$16,394
Cost:
$13,060
- - - - - - $16,394 2,855 - - -
-
kWh
-
-
kW-months/year
-
-
$
$16,394
2,855
MMBtu
-
-
lb
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,127
Cost:
$400
$11,449 144,929 $1,678 279 - - - - - - $11,449
144,929
kWh
$1,678
279
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
09: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$7,881
Cost:
$2,500
- - - - - - $7,881 1,235 - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,881
1,235
MMBtu
-
-
lb
10: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,915
Cost:
$189
$2,915 36,899 - - - - - - - - $2,915
36,899
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,485
Cost:
$3,600
- - - - - - $2,485 389 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,485
389
MMBtu
-
-
lb
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,229
Cost:
$500
$1,811 22,916 $418 69 - - - - - - $1,811
22,916
kWh
$418
69
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,076
Cost:
$300
$3,076 38,938 - - - - - - - - $3,076
38,938
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$412,440
Cost:
$882,049
$356,733 4,515,607 $52,040 8,645 $19,938 - $(-124,471) 11,852 $108,200 - $356,733
4,515,607
kWh
$52,040
8,645
kW-months/year
$19,938
-
$
$(-124,471)
11,852
MMBtu
$108,200
-
lb
TOTAL IMPLEMENTED Savings:
$121,625
Cost:
$88,189
$46,259 585,565 $6,352 1,056 $19,938 - $49,076 7,692 - - $46,259
585,565
kWh
$6,352
1,056
kW-months/year
$19,938
-
$
$49,076
7,692
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)