Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2006 |
Principal Product | Corrugated Cardboard Boxes |
NAICS | 322211 - Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 6,240 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $394,838 | 4,967,500 | kWh | $0.08 |
Electricity Demand | $77,008 | 12,792 | kW-months/year | $6.02 |
Natural Gas | $333,080 | 52,193 | MMBtu | $6.38 |
TOTAL ENERGY COSTS | $804,926 | |||
RECOMMENDED SAVINGS* | $412,440 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $121,625 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $140,853 Cost: $660,000 |
$295,776 | 3,744,000 | $43,344 | 7,200 | - | - | $(-198,267) | - | - | - |
$295,776 3,744,000 kWh |
$43,344 7,200 kW-months/year |
- - $ |
$(-198,267) - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $128,263 Cost: $120,000 |
$9,811 | 124,188 | $1,926 | 320 | - | - | $8,326 | 1,305 | $108,200 | - |
$9,811 124,188 kWh |
$1,926 320 kW-months/year |
- - $ |
$8,326 1,305 MMBtu |
$108,200 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $29,942 Cost: $13,500 |
$26,115 | 330,575 | $3,827 | 636 | - | - | - | - | - | - |
$26,115 330,575 kWh |
$3,827 636 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $26,565 Cost: $51,000 |
$5,780 | 73,162 | $847 | 141 | $19,938 | - | - | - | - | - |
$5,780 73,162 kWh |
$847 141 kW-months/year |
$19,938 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $21,498 Cost: $4,500 |
- | - | - | - | - | - | $21,498 | 3,370 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$21,498 3,370 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $17,212 Cost: $12,500 |
- | - | - | - | - | - | $17,212 | 2,698 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$17,212 2,698 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $16,394 Cost: $13,060 |
- | - | - | - | - | - | $16,394 | 2,855 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$16,394 2,855 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $13,127 Cost: $400 |
$11,449 | 144,929 | $1,678 | 279 | - | - | - | - | - | - |
$11,449 144,929 kWh |
$1,678 279 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $7,881 Cost: $2,500 |
- | - | - | - | - | - | $7,881 | 1,235 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$7,881 1,235 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $2,915 Cost: $189 |
$2,915 | 36,899 | - | - | - | - | - | - | - | - |
$2,915 36,899 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,485 Cost: $3,600 |
- | - | - | - | - | - | $2,485 | 389 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,485 389 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,229 Cost: $500 |
$1,811 | 22,916 | $418 | 69 | - | - | - | - | - | - |
$1,811 22,916 kWh |
$418 69 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,076 Cost: $300 |
$3,076 | 38,938 | - | - | - | - | - | - | - | - |
$3,076 38,938 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $412,440 Cost: $882,049 |
$356,733 | 4,515,607 | $52,040 | 8,645 | $19,938 | - | $(-124,471) | 11,852 | $108,200 | - | $356,733 4,515,607 kWh |
$52,040 8,645 kW-months/year |
$19,938 - $ |
$(-124,471) 11,852 MMBtu |
$108,200 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $121,625 Cost: $88,189 |
$46,259 | 585,565 | $6,352 | 1,056 | $19,938 | - | $49,076 | 7,692 | - | - | $46,259 585,565 kWh |
$6,352 1,056 kW-months/year |
$19,938 - $ |
$49,076 7,692 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) |