IAC Assessment: LE0251
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2007
Principal Product gray and ductile iron casings
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 53
Plant Area (Sq.Ft.) 115,000
Annual Production 1,500 Tons
Production Hrs. Annual 2,040
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,096 2,133,159 kWh $0.05
Electricity Demand $103,963 10,428 kW-months/year $9.97
Natural Gas $93,556 6,145 MMBtu $15.22
Fuel Oil #2 $98,271 6,754 MMBtu $14.55
TOTAL ENERGY COSTS $398,886
RECOMMENDED SAVINGS* $108,419 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,751
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$35,204
Cost:
$3,330
- - - - - - $35,204 2,313 -
-
kWh
-
-
kW-months/year
-
-
$
$35,204
2,313
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$21,905
Cost:
$15,088
$5,823 121,304 $16,082 1,613 - - - - $5,823
121,304
kWh
$16,082
1,613
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$18,340
Cost:
$24,000
- - - - - - $18,340 1,205 -
-
kWh
-
-
kW-months/year
-
-
$
$18,340
1,205
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,085
Cost:
$1,000
$5,605 116,784 $5,480 550 - - - - $5,605
116,784
kWh
$5,480
550
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,122
Cost:
$194
$4,557 94,908 $5,565 558 - - - - $4,557
94,908
kWh
$5,565
558
kW-months/year
-
-
$
-
-
MMBtu
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,198
Cost:
$7,003
- - $5,198 521 - - - - -
-
kWh
$5,198
521
kW-months/year
-
-
$
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,551
Cost:
$4,650
- - - - $3,551 - - - -
-
kWh
-
-
kW-months/year
$3,551
-
$
-
-
MMBtu
08: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$2,117
Cost:
$1,500
- - $2,117 212 - - - - -
-
kWh
$2,117
212
kW-months/year
-
-
$
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$758
Cost:
$300
$386 8,036 $372 37 - - - - $386
8,036
kWh
$372
37
kW-months/year
-
-
$
-
-
MMBtu
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$139
Cost:
$125
- - - - - - $139 15 -
-
kWh
-
-
kW-months/year
-
-
$
$139
15
MMBtu
TOTAL RECOMMENDED Savings:
$108,419
Cost:
$57,190
$16,371 341,032 $34,814 3,491 $3,551 - $53,683 3,533 $16,371
341,032
kWh
$34,814
3,491
kW-months/year
$3,551
-
$
$53,683
3,533
MMBtu
TOTAL IMPLEMENTED Savings:
$74,751
Cost:
$28,524
$10,162 211,692 $11,045 1,108 - - $53,544 3,518 $10,162
211,692
kWh
$11,045
1,108
kW-months/year
-
-
$
$53,544
3,518
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas