IAC Assessment: LE0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2007
Principal Product Aluminum powder
NAICS 331314 - Secondary Smelting and Alloying of Aluminum
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 75,000
Annual Production 100,000 Units
Production Hrs. Annual 8,400
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $290,817 5,593,200 kWh $0.05
Electricity Demand $82,020 11,051 kW-months/year $7.42
Natural Gas $499,782 40,409 MMBtu $12.37
TOTAL ENERGY COSTS $872,619
RECOMMENDED SAVINGS* $332,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,753
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$196,792
Cost:
$500
- - - - - - $196,792 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$196,792
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$71,526
Cost:
$75,000
$17,855 343,361 $3,671 495 - - $50,000 - $17,855
343,361
kWh
$3,671
495
kW-months/year
-
-
MMBtu
$50,000
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,454
Cost:
$12,000
$14,554 285,367 $2,900 392 - - - - $14,554
285,367
kWh
$2,900
392
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,461
Cost:
$20
$13,602 261,571 $1,859 251 - - - - $13,602
261,571
kWh
$1,859
251
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,661
Cost:
$100
$7,300 135,189 $1,361 186 - - - - $7,300
135,189
kWh
$1,361
186
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,137
Cost:
$5,000
- - - - $7,137 577 - - -
-
kWh
-
-
kW-months/year
$7,137
577
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,155
Cost:
$1,500
$4,826 92,802 $1,329 177 - - - - $4,826
92,802
kWh
$1,329
177
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,476
Cost:
$150
$4,549 87,479 $927 125 - - - - $4,549
87,479
kWh
$927
125
kW-months/year
-
-
MMBtu
-
-
$
09: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$3,985
Cost:
$300
- - $3,985 537 - - - - -
-
kWh
$3,985
537
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$332,647
Cost:
$94,570
$62,686 1,205,769 $16,032 2,163 $7,137 577 $246,792 - $62,686
1,205,769
kWh
$16,032
2,163
kW-months/year
$7,137
577
MMBtu
$246,792
-
$
TOTAL IMPLEMENTED Savings:
$35,753
Cost:
$1,770
$30,277 577,041 $5,476 739 - - - - $30,277
577,041
kWh
$5,476
739
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost