Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2007 |
Principal Product | Waste Oil Furnaces |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 5,500 Units |
Production Hrs. Annual | 4,420 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $119,745 | 1,910,400 | kWh | $0.06 |
Electricity Demand | $49,108 | 5,617 | kW-months/year | $8.74 |
Natural Gas | $23,262 | 5,786 | MMBtu | $4.02 |
TOTAL ENERGY COSTS | $192,115 | |||
RECOMMENDED SAVINGS* | $96,002 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $67,026 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.422 UTILIZE OUTSIDE CONTRACTING |
Savings: $45,000 Cost: $7,800 |
- | - | - | - | - | - | $45,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$45,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $10,266 Cost: $2,250 |
$10,266 | 162,949 | - | - | - | - | - | - |
$10,266 162,949 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,608 Cost: $860 |
$4,456 | 70,562 | $3,152 | 360 | - | - | - | - |
$4,456 70,562 kWh |
$3,152 360 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $5,367 Cost: $46 |
$5,367 | 85,197 | - | - | - | - | - | - |
$5,367 85,197 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,558 Cost: - |
$822 | 13,055 | $2,736 | 313 | - | - | - | - |
$822 13,055 kWh |
$2,736 313 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $594 Cost: - |
$265 | 4,206 | $192 | 22 | $137 | 34 | - | - |
$265 4,206 kWh |
$192 22 kW-months/year |
$137 34 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $623 Cost: $200 |
$448 | 7,113 | $175 | 20 | - | - | - | - |
$448 7,113 kWh |
$175 20 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $429 Cost: $600 |
- | - | - | - | $429 | 180 | - | - |
- - kWh |
- - kW-months/year |
$429 180 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $22,557 Cost: $58,273 |
$13,179 | 209,196 | $9,378 | 1,073 | - | - | - | - |
$13,179 209,196 kWh |
$9,378 1,073 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $96,002 Cost: $70,029 |
$34,803 | 552,278 | $15,633 | 1,788 | $566 | 214 | $45,000 | - | $34,803 552,278 kWh |
$15,633 1,788 kW-months/year |
$566 214 MMBtu |
$45,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $67,026 Cost: $10,910 |
$15,809 | 250,772 | $6,080 | 695 | $137 | 34 | $45,000 | - | $15,809 250,772 kWh |
$6,080 695 kW-months/year |
$137 34 MMBtu |
$45,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production |