Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2009 |
Principal Product | fluorescent and HID light fixtures |
NAICS | 335122 - Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing |
SIC | 3645 - Residential Lighting Fixtures |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 285,000 |
Annual Production | 1,500,000 Units |
Production Hrs. Annual | 4,160 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $213,736 | 3,031,924 | kWh | $0.07 |
Electricity Demand | $98,205 | 7,184 | kW-months/year | $13.67 |
Natural Gas | $207,447 | 8,736 | MMBtu | $23.75 |
TOTAL ENERGY COSTS | $519,388 | |||
RECOMMENDED SAVINGS* | $65,573 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,496 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $29,667 Cost: $27,000 |
$10,310 | 147,274 | $19,357 | 1,416 | - | - |
$10,310 147,274 kWh |
$19,357 1,416 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $11,701 Cost: $2,700 |
- | - | - | - | $11,701 | 498 |
- - kWh |
- - kW-months/year |
$11,701 498 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $5,415 Cost: $180 |
- | - | - | - | $5,415 | 228 |
- - kWh |
- - kW-months/year |
$5,415 228 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $4,921 Cost: $3,000 |
- | - | $4,921 | 360 | - | - |
- - kWh |
$4,921 360 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,424 Cost: $1,840 |
$2,825 | 40,425 | $1,599 | 117 | - | - |
$2,825 40,425 kWh |
$1,599 117 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,459 Cost: $200 |
$2,160 | 30,996 | $1,299 | 95 | - | - |
$2,160 30,996 kWh |
$1,299 95 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,073 Cost: $3,000 |
$1,610 | 23,087 | $1,463 | 107 | - | - |
$1,610 23,087 kWh |
$1,463 107 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,952 Cost: $1,000 |
$1,173 | 16,752 | $779 | 57 | - | - |
$1,173 16,752 kWh |
$779 57 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $961 Cost: $420 |
$961 | 13,726 | - | - | - | - |
$961 13,726 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,573 Cost: $39,340 |
$19,039 | 272,260 | $29,418 | 2,152 | $17,116 | 726 | $19,039 272,260 kWh |
$29,418 2,152 kW-months/year |
$17,116 726 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,496 Cost: $33,800 |
$15,041 | 215,083 | $27,040 | 1,978 | $5,415 | 228 | $15,041 215,083 kWh |
$27,040 1,978 kW-months/year |
$5,415 228 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |