IAC logo
IAC Assessment: LE0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2010
Principal Product books
NAICS 323117 - Books Printing
SIC 2732 - Book Printing
Sales <$500,000
# of Employees 321
Plant Area (Sq.Ft.) 475,000
Annual Production 79,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $742,841 13,905,600 kWh $0.05
Electricity Demand $237,195 27,286 kW-months/year $8.69
Natural Gas $610,699 49,862 MMBtu $12.25
TOTAL ENERGY COSTS $1,590,735
RECOMMENDED SAVINGS* $237,090 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$81,866
Cost:
$60,000
- - - - $81,866 6,683 -
-
kWh
-
-
kW-months/year
$81,866
6,683
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$47,762
Cost:
$17,000
$38,430 725,111 $9,332 1,074 - - $38,430
725,111
kWh
$9,332
1,074
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$28,242
Cost:
$1,720
$22,350 421,707 $5,892 678 - - $22,350
421,707
kWh
$5,892
678
kW-months/year
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$27,533
Cost:
-
$10,935 206,333 $16,598 1,910 - - $10,935
206,333
kWh
$16,598
1,910
kW-months/year
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$15,838
Cost:
$250
$8,537 161,073 - - $7,301 596 $8,537
161,073
kWh
-
-
kW-months/year
$7,301
596
MMBtu
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$12,566
Cost:
$35,000
$10,256 193,509 $2,310 266 - - $10,256
193,509
kWh
$2,310
266
kW-months/year
-
-
MMBtu
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,857
Cost:
-
- - $11,857 1,364 - - -
-
kWh
$11,857
1,364
kW-months/year
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,426
Cost:
$2,800
$6,245 117,836 $2,181 251 - - $6,245
117,836
kWh
$2,181
251
kW-months/year
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,000
Cost:
$900
$3,000 56,609 - - - - $3,000
56,609
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$237,090
Cost:
$117,670
$99,753 1,882,178 $48,170 5,543 $89,167 7,279 $99,753
1,882,178
kWh
$48,170
5,543
kW-months/year
$89,167
7,279
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas