IAC Assessment: LE0308
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0308
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2010
Principal Product Fire fighting foam
NAICS 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 16
Plant Area (Sq.Ft.) 100,000
Annual Production 1,000 Thousand Gallons
Production Hrs. Annual 4,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,851 431,036 kWh $0.14
Natural Gas $176,783 19,009 MMBtu $9.30
TOTAL ENERGY COSTS $237,634
RECOMMENDED SAVINGS* $77,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,118
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$21,676
Cost:
$250
$13,931 98,803 $7,745 833 $13,931
98,803
kWh
$7,745
833
MMBtu
02: 2.1224 REPLACE BOILER Savings:
$18,600
Cost:
$210,000
- - $18,600 2,000 -
-
kWh
$18,600
2,000
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,731
Cost:
$12,600
- - $10,731 1,154 -
-
kWh
$10,731
1,154
MMBtu
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$8,965
Cost:
$25,000
- - $8,965 964 -
-
kWh
$8,965
964
MMBtu
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$7,842
Cost:
$6,180
- - $7,842 843 -
-
kWh
$7,842
843
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,037
Cost:
$1,720
$2,037 14,446 - - $2,037
14,446
kWh
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,146
Cost:
$700
$1,146 8,131 - - $1,146
8,131
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,733
Cost:
$7,344
$2,733 16,211 - - $2,733
16,211
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,491
Cost:
$7,592
$2,491 17,001 - - $2,491
17,001
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$971
Cost:
$14,300
$971 6,897 - - $971
6,897
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$77,192
Cost:
$285,686
$23,309 161,489 $53,883 5,794 $23,309
161,489
kWh
$53,883
5,794
MMBtu
TOTAL IMPLEMENTED Savings:
$48,118
Cost:
$216,430
$13,931 98,803 $34,187 3,676 $13,931
98,803
kWh
$34,187
3,676
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas