IAC Assessment: LE0315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2011
Principal Product Frozen Food
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2053 - Frozen Bakery Products, Except Bread
Sales $100,000,000-$500,000,000
# of Employees 329
Plant Area (Sq.Ft.) 233,000
Annual Production 64,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,061,733 18,520,951 kWh $0.06
Electricity Demand $516,916 35,132 kW-months/year $14.71
Natural Gas $323,347 59,394 MMBtu $5.44
TOTAL ENERGY COSTS $1,901,996
RECOMMENDED SAVINGS* $541,066 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,698
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$404,827
Cost:
$2,200,000
$957,600 16,800,000 $353,040 24,000 $(-905,813) (-166,510) - - $957,600
16,800,000
kWh
$353,040
24,000
kW-months/year
$(-905,813)
(-166,510)
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$48,359
Cost:
$25,500
$32,319 567,003 $16,040 1,090 - - - - $32,319
567,003
kWh
$16,040
1,090
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$25,842
Cost:
$2,500
- - $25,842 1,757 - - - - -
-
kWh
$25,842
1,757
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$22,464
Cost:
$250
$16,097 282,408 - - $6,367 1,170 - - $16,097
282,408
kWh
-
-
kW-months/year
$6,367
1,170
MMBtu
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$18,864
Cost:
$50,000
$5,332 93,542 $2,265 158 $9,267 1,703 $2,000 - $5,332
93,542
kWh
$2,265
158
kW-months/year
$9,267
1,703
MMBtu
$2,000
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,689
Cost:
$40
$5,675 99,572 $2,014 137 - - - - $5,675
99,572
kWh
$2,014
137
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$6,281
Cost:
$20,000
- - - - $6,281 1,154 - - -
-
kWh
-
-
kW-months/year
$6,281
1,154
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,370
Cost:
$2,000
$3,230 56,631 $2,140 145 - - - - $3,230
56,631
kWh
$2,140
145
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,370
Cost:
$249
- - - - $1,370 252 - - -
-
kWh
-
-
kW-months/year
$1,370
252
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$541,066
Cost:
$2,300,539
$1,020,253 17,899,156 $401,341 27,287 $(-882,528) (-162,231) $2,000 - $1,020,253
17,899,156
kWh
$401,341
27,287
kW-months/year
$(-882,528)
(-162,231)
MMBtu
$2,000
-
$
TOTAL IMPLEMENTED Savings:
$42,698
Cost:
$50,499
$21,429 375,950 $2,265 158 $17,004 3,125 $2,000 - $21,429
375,950
kWh
$2,265
158
kW-months/year
$17,004
3,125
MMBtu
$2,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes