Assessment Year | 2011 |
Principal Product | Jet Engine Blades/Vanes |
NAICS | 336412 - Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724 - Aircraft Engines And Engine Parts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 14 |
Plant Area (Sq.Ft.) | 70,230 |
Annual Production | 86,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $211,606 | 2,590,000 | kWh | $0.08 |
Electricity Demand | $46,930 | 7,329 | kW-months/year | $6.40 |
TOTAL ENERGY COSTS | $258,536 | |||
RECOMMENDED SAVINGS* | $49,227 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,652 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,801 Cost: $8,300 |
$8,265 | 100,799 | $1,536 | 240 | - | - |
$8,265 100,799 kWh |
$1,536 240 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,323 Cost: $1,360 |
$4,709 | 57,438 | $614 | 96 | - | - |
$4,709 57,438 kWh |
$614 96 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,529 Cost: $30 |
$3,909 | 47,673 | $620 | 97 | - | - |
$3,909 47,673 kWh |
$620 97 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,115 Cost: $800 |
$1,840 | 22,461 | $275 | 43 | - | - |
$1,840 22,461 kWh |
$275 43 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,996 Cost: $7,200 |
- | - | - | - | $1,996 | 3,461 |
- - kWh |
- - kW-months/year |
$1,996 3,461 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,196 Cost: $165 |
$1,001 | 12,212 | $195 | 31 | - | - |
$1,001 12,212 kWh |
$195 31 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,464 Cost: $60,000 |
$18,109 | 220,838 | $2,355 | 368 | - | - |
$18,109 220,838 kWh |
$2,355 368 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,803 Cost: $18,000 |
$3,366 | 41,040 | $437 | 68 | - | - |
$3,366 41,040 kWh |
$437 68 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,227 Cost: $95,855 |
$41,199 | 502,461 | $6,032 | 943 | $1,996 | 3,461 | $41,199 502,461 kWh |
$6,032 943 kW-months/year |
$1,996 3,461 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,652 Cost: $27,855 |
$21,250 | 259,162 | $3,402 | 532 | - | - | $21,250 259,162 kWh |
$3,402 532 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |