IAC Assessment: LE0324
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0324
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2011
Principal Product Wood Furniture
NAICS 337122 - Nonupholstered Wood Household Furniture Manufacturing
SIC 2511 - Wood Household Furniture
Sales $50,000,000-$100,000,000
# of Employees 20
Plant Area (Sq.Ft.) 225,000
Annual Production 150,000 Pieces
Production Hrs. Annual 2,066
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,974 1,363,740 kWh $0.09
Electricity Demand $37,809 7,170 kW-months/year $5.27
Natural Gas $44,132 4,040 MMBtu $10.92
TOTAL ENERGY COSTS $199,915
RECOMMENDED SAVINGS* $36,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,284
Cost:
$122,400
- - - - $8,284 759 - - -
-
kWh
-
-
kW-months/year
$8,284
759
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,133
Cost:
$5,085
$2,399 27,570 $5,734 1,088 - - - - $2,399
27,570
kWh
$5,734
1,088
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,830
Cost:
$28,998
$3,570 41,036 $2,740 520 - - $520 - $3,570
41,036
kWh
$2,740
520
kW-months/year
-
-
MMBtu
$520
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,665
Cost:
$400
$3,770 43,337 $895 170 - - - - $3,770
43,337
kWh
$895
170
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,126
Cost:
$26,983
$2,998 34,465 $1,054 200 - - $74 - $2,998
34,465
kWh
$1,054
200
kW-months/year
-
-
MMBtu
$74
-
$
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$2,832
Cost:
$7,000
- - $2,832 537 - - - - -
-
kWh
$2,832
537
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,778
Cost:
$416
$1,778 20,431 - - - - - - $1,778
20,431
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$297
Cost:
$530
$274 3,145 $23 4 - - - - $274
3,145
kWh
$23
4
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$36,945
Cost:
$191,812
$14,789 169,984 $13,278 2,519 $8,284 759 $594 - $14,789
169,984
kWh
$13,278
2,519
kW-months/year
$8,284
759
MMBtu
$594
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost