IAC Center | Lehigh University |
---|---|
Assessment Year | 2012 |
Principal Product | Carbon Flat Roll Products |
NAICS | 331221 - Rolled Steel Shape Manufacturing |
SIC | 3316 - Cold Finishing Of Steel Shapes |
Sales | <$500,000 |
# of Employees | 62 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 60,000 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $73,794 | 1,054,200 | kWh | $0.07 |
Electricity Demand | $21,653 | 10,137 | kW-months/year | $2.14 |
Natural Gas | $56,586 | 4,556 | MMBtu | $12.42 |
TOTAL ENERGY COSTS | $152,033 | |||
RECOMMENDED SAVINGS* | $136,893 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,518 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $66,813 Cost: - |
- | - | - | - | $66,813 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$66,813 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $16,976 Cost: $7,660 |
- | - | - | - | - | - | $16,976 | 1,367 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$16,976 1,367 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $12,677 Cost: $25,375 |
- | - | - | - | - | - | $12,677 | 1,048 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$12,677 1,048 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $9,659 Cost: $24,370 |
$10,012 | 143,030 | $13 | 6 | - | - | - | - | $(-366) | - |
$10,012 143,030 kWh |
$13 6 kW-months/year |
- - $ |
- - MMBtu |
$(-366) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $8,856 Cost: $28,000 |
$8,364 | 119,479 | $492 | 230 | - | - | - | - | - | - |
$8,364 119,479 kWh |
$492 230 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $7,328 Cost: $23,400 |
- | - | - | - | - | - | $7,328 | 629 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$7,328 629 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.625 DEVELOP STANDARD OPERATING PROCEDURES |
Savings: $6,689 Cost: - |
$6,689 | 95,583 | - | - | - | - | - | - | - | - |
$6,689 95,583 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,829 Cost: $40 |
$3,616 | 51,660 | $213 | 99 | - | - | - | - | - | - |
$3,616 51,660 kWh |
$213 99 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,360 Cost: $6,400 |
$3,006 | 42,952 | $354 | 165 | - | - | - | - | - | - |
$3,006 42,952 kWh |
$354 165 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $706 Cost: $4,580 |
$710 | 10,152 | $4 | 2 | - | - | - | - | $(-7) | - |
$710 10,152 kWh |
$4 2 kW-months/year |
- - $ |
- - MMBtu |
$(-7) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $136,893 Cost: $119,825 |
$32,397 | 462,856 | $1,076 | 502 | $66,813 | - | $36,981 | 3,044 | $(-373) | - | $32,397 462,856 kWh |
$1,076 502 kW-months/year |
$66,813 - $ |
$36,981 3,044 MMBtu |
$(-373) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,518 Cost: $40 |
$10,305 | 147,243 | $213 | 99 | - | - | - | - | - | - | $10,305 147,243 kWh |
$213 99 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost |