IAC Assessment: LE0345
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0345
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2012
Principal Product Woven Narrow Fabrics
NAICS 313220 - Narrow Fabric Mills and Schiffli Machine Embroidery
SIC 2241 - Narrow Fabric Mills
Sales $10,000,000-$50,000,000
# of Employees 14
Plant Area (Sq.Ft.) 104,730
Annual Production 78,000,000 Units
Production Hrs. Annual 4,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,720 497,100 kWh $0.09
Electricity Demand $12,716 2,564 kW-months/year $4.96
Electricity Fees $3,948 - $ -
Natural Gas $0 0 MMBtu $5.00
Fuel Oil #4 $284,966 13,161 MMBtu $21.65
TOTAL ENERGY COSTS $393,419
RECOMMENDED SAVINGS* $340,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $320,214
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #4 Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #4
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$737
Cost:
$2,800
$639 6,795 $98 20 - - - - - - $639
6,795
kWh
$98
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$16,178
Cost:
$750
- - - - - - - - $16,178 747 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$16,178
747
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,658
Cost:
$550
$1,435 15,262 $223 45 - - - - - - $1,435
15,262
kWh
$223
45
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,195
Cost:
$6,750
$1,841 19,584 $286 58 $68 - - - - - $1,841
19,584
kWh
$286
58
kW-months/year
$68
-
$
-
-
MMBtu
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$21,763
Cost:
$3,800
- - - - - - - - $21,763 1,007 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$21,763
1,007
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,352
Cost:
$575
$766 8,148 - - - - - - $5,586 258 $766
8,148
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,586
258
MMBtu
07: 2.1224 REPLACE BOILER Savings:
$226,873
Cost:
$560,000
- - - - - - $(-58,063) (-11,613) $284,936 13,161 -
-
kWh
-
-
kW-months/year
-
-
$
$(-58,063)
(-11,613)
MMBtu
$284,936
13,161
MMBtu
08: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$2,858
Cost:
$12,810
- - - - - - - - $2,858 132 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,858
132
MMBtu
09: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$3,306
Cost:
$3,800
- - - - - - - - $3,306 153 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,306
153
MMBtu
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,720
Cost:
$7,500
$4,120 43,829 $600 121 - - - - - - $4,120
43,829
kWh
$600
121
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$53,742
Cost:
$3,200
- - - - - - - - $53,742 2,482 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$53,742
2,482
MMBtu
TOTAL RECOMMENDED Savings:
$340,382
Cost:
$602,535
$8,800 93,618 $1,207 244 $68 - $(-58,063) (-11,613) $388,369 17,940 $8,800
93,618
kWh
$1,207
244
kW-months/year
$68
-
$
$(-58,063)
(-11,613)
MMBtu
$388,369
17,940
MMBtu
TOTAL IMPLEMENTED Savings:
$320,214
Cost:
$568,300
$1,435 15,262 $223 45 - - $(-58,063) (-11,613) $376,619 17,397 $1,435
15,262
kWh
$223
45
kW-months/year
-
-
$
$(-58,063)
(-11,613)
MMBtu
$376,619
17,397
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #4 Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #4