Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2012 |
Principal Product | Rolled Copper Strip |
NAICS | 331420 - Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351 - Copper Rolling And Drawing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 6,864 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $586,281 | 7,311,109 | kWh | $0.08 |
Electricity Demand | $26,713 | 18,772 | kW-months/year | $1.42 |
Electricity Fees | $1,232 | - | $ | - |
TOTAL ENERGY COSTS | $614,226 | |||
RECOMMENDED SAVINGS* | $117,912 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $92,826 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Primary Raw Material | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,018 Cost: $7,190 |
$1,779 | 22,239 | $162 | 114 | - | - | $77 | - |
$1,779 22,239 kWh |
$162 114 kW-months/year |
- - $ |
$77 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $85,383 Cost: $310,000 |
$169,703 | 2,121,293 | $5,248 | 3,696 | $(-89,568) | - | - | - |
$169,703 2,121,293 kWh |
$5,248 3,696 kW-months/year |
$(-89,568) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,249 Cost: $40 |
$6,101 | 76,267 | $148 | 104 | - | - | - | - |
$6,101 76,267 kWh |
$148 104 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,253 Cost: $1,248 |
$1,230 | 15,374 | $23 | 16 | - | - | - | - |
$1,230 15,374 kWh |
$23 16 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,373 Cost: $1,080 |
$4,269 | 53,363 | $104 | 73 | - | - | - | - |
$4,269 53,363 kWh |
$104 73 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,052 Cost: $200 |
$1,008 | 12,601 | $44 | 31 | - | - | - | - |
$1,008 12,601 kWh |
$44 31 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,510 Cost: $12,700 |
$15,945 | 199,315 | $565 | 398 | - | - | - | - |
$15,945 199,315 kWh |
$565 398 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $1,074 Cost: $5,200 |
- | - | $1,074 | 756 | - | - | - | - |
- - kWh |
$1,074 756 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $117,912 Cost: $337,658 |
$200,035 | 2,500,452 | $7,368 | 5,188 | $(-89,568) | - | $77 | - | $200,035 2,500,452 kWh |
$7,368 5,188 kW-months/year |
$(-89,568) - $ |
$77 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $92,826 Cost: $318,470 |
$176,759 | 2,209,496 | $5,558 | 3,914 | $(-89,568) | - | $77 | - | $176,759 2,209,496 kWh |
$5,558 3,914 kW-months/year |
$(-89,568) - $ |
$77 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Primary Raw Material | Ancillary Material Cost |