IAC Assessment: LE0349
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2012
Principal Product Rolled Copper Strip
NAICS 331420 - Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351 - Copper Rolling And Drawing
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 85,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $586,281 7,311,109 kWh $0.08
Electricity Demand $26,713 18,772 kW-months/year $1.42
Electricity Fees $1,232 - $ -
TOTAL ENERGY COSTS $614,226
RECOMMENDED SAVINGS* $117,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,826
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,018
Cost:
$7,190
$1,779 22,239 $162 114 - - $77 - $1,779
22,239
kWh
$162
114
kW-months/year
-
-
$
$77
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$85,383
Cost:
$310,000
$169,703 2,121,293 $5,248 3,696 $(-89,568) - - - $169,703
2,121,293
kWh
$5,248
3,696
kW-months/year
$(-89,568)
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,249
Cost:
$40
$6,101 76,267 $148 104 - - - - $6,101
76,267
kWh
$148
104
kW-months/year
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,253
Cost:
$1,248
$1,230 15,374 $23 16 - - - - $1,230
15,374
kWh
$23
16
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,373
Cost:
$1,080
$4,269 53,363 $104 73 - - - - $4,269
53,363
kWh
$104
73
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,052
Cost:
$200
$1,008 12,601 $44 31 - - - - $1,008
12,601
kWh
$44
31
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,510
Cost:
$12,700
$15,945 199,315 $565 398 - - - - $15,945
199,315
kWh
$565
398
kW-months/year
-
-
$
-
-
$
08: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,074
Cost:
$5,200
- - $1,074 756 - - - - -
-
kWh
$1,074
756
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$117,912
Cost:
$337,658
$200,035 2,500,452 $7,368 5,188 $(-89,568) - $77 - $200,035
2,500,452
kWh
$7,368
5,188
kW-months/year
$(-89,568)
-
$
$77
-
$
TOTAL IMPLEMENTED Savings:
$92,826
Cost:
$318,470
$176,759 2,209,496 $5,558 3,914 $(-89,568) - $77 - $176,759
2,209,496
kWh
$5,558
3,914
kW-months/year
$(-89,568)
-
$
$77
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost