IAC Assessment: LE0352
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2013
Principal Product Metal Parts
NAICS 332323 - Ornamental and Architectural Metal Work Manufacturing
SIC 3446 - Architectural Metal Work
Sales $10,000,000-$50,000,000
# of Employees 18
Plant Area (Sq.Ft.) 2,800
Annual Production 200,000 Units
Production Hrs. Annual 2,340
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,635 3,626,668 kWh $0.07
Electricity Fees $117,023 - $ -
Natural Gas $76,004 11,695 MMBtu $6.50
TOTAL ENERGY COSTS $459,662
RECOMMENDED SAVINGS* $32,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,414
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,554
Cost:
$7,670
$4,696 63,457 - - $858 - $4,696
63,457
kWh
-
-
MMBtu
$858
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,145
Cost:
$9,935
$3,004 40,593 - - $141 - $3,004
40,593
kWh
-
-
MMBtu
$141
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,554
Cost:
$4,768
$15,554 210,189 - - - - $15,554
210,189
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,631
Cost:
$1,000
$2,631 35,560 - - - - $2,631
35,560
kWh
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,414
Cost:
$2,750
$2,414 32,615 - - - - $2,414
32,615
kWh
-
-
MMBtu
-
-
$
06: 2.2615 CLEAN CONDENSER TUBES Savings:
$2,216
Cost:
$12,000
$2,216 29,948 - - - - $2,216
29,948
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,176
Cost:
$1,000
- - $1,176 181 - - -
-
kWh
$1,176
181
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,690
Cost:
$39,123
$30,515 412,362 $1,176 181 $999 - $30,515
412,362
kWh
$1,176
181
MMBtu
$999
-
$
TOTAL IMPLEMENTED Savings:
$2,414
Cost:
$2,750
$2,414 32,615 - - - - $2,414
32,615
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost