IAC logo
IAC Assessment: LE0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2013
Principal Product Pumps
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $50,000,000-$100,000,000
# of Employees 99
Plant Area (Sq.Ft.) 100,000
Annual Production 21,000 Pieces
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,005 2,607,983 kWh $0.06
Electricity Demand $69,331 31,214 kW-months/year $2.22
Electricity Fees $26,053 - $ -
Natural Gas $23,245 2,025 MMBtu $11.48
TOTAL ENERGY COSTS $283,634
RECOMMENDED SAVINGS* $50,966 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,023
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,254
Cost:
$26,400
$5,844 92,767 $282 127 - - $128 - $5,844
92,767
kWh
$282
127
kW-months/year
-
-
MMBtu
$128
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,383
Cost:
$11,830
$3,161 50,181 $366 165 - - $856 - $3,161
50,181
kWh
$366
165
kW-months/year
-
-
MMBtu
$856
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$803
Cost:
$1,900
- - - - $803 70 - - -
-
kWh
-
-
kW-months/year
$803
70
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,970
Cost:
$2,640
$2,797 44,392 $173 78 - - - - $2,797
44,392
kWh
$173
78
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,537
Cost:
$5,280
$11,568 183,620 $3,969 1,788 - - - - $11,568
183,620
kWh
$3,969
1,788
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,029
Cost:
$9,000
$4,007 63,604 $22 10 - - - - $4,007
63,604
kWh
$22
10
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,174
Cost:
$1,200
$1,174 18,542 - - - - - - $1,174
18,542
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$13,937
Cost:
$25,932
$12,874 203,385 $1,063 480 - - - - $12,874
203,385
kWh
$1,063
480
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,879
Cost:
$1,000
$1,710 27,138 $169 76 - - - - $1,710
27,138
kWh
$169
76
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,966
Cost:
$85,182
$43,135 683,629 $6,044 2,724 $803 70 $984 - $43,135
683,629
kWh
$6,044
2,724
kW-months/year
$803
70
MMBtu
$984
-
$
TOTAL IMPLEMENTED Savings:
$6,023
Cost:
$4,840
$5,681 90,072 $342 154 - - - - $5,681
90,072
kWh
$342
154
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost