IAC logo
IAC Assessment: LE0364
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2013
Principal Product Corrugated Shipping Containers
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 264
Plant Area (Sq.Ft.) 522,000
Annual Production 1,700,000 Thousand Feet
Production Hrs. Annual 7,488
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $586,311 9,150,282 kWh $0.06
Electricity Demand $154,529 43,031 kW-months/year $3.59
Natural Gas $617,387 58,552 MMBtu $10.54
TOTAL ENERGY COSTS $1,358,227
RECOMMENDED SAVINGS* $127,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,532
Cost:
$10,100
$10,900 170,316 $1,632 455 $10,900
170,316
kWh
$1,632
455
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,744
Cost:
$1,360
$1,744 27,256 - - $1,744
27,256
kWh
-
-
kW-months/year
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$10,131
Cost:
$393
$9,294 145,226 $836 233 $9,294
145,226
kWh
$836
233
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,900
Cost:
$1,000
$4,552 71,121 $348 97 $4,552
71,121
kWh
$348
97
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,249
Cost:
$228
$110 1,723 $1,139 317 $110
1,723
kWh
$1,139
317
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,535
Cost:
$22,875
$16,088 251,372 $1,447 403 $16,088
251,372
kWh
$1,447
403
kW-months/year
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,989
Cost:
$28,700
$22,011 343,925 $1,978 551 $22,011
343,925
kWh
$1,978
551
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$29,988
Cost:
$35,500
$27,514 429,907 $2,474 689 $27,514
429,907
kWh
$2,474
689
kW-months/year
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,865
Cost:
$14
$6,259 97,791 $607 169 $6,259
97,791
kWh
$607
169
kW-months/year
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,998
Cost:
$8,300
$5,503 85,982 $495 138 $5,503
85,982
kWh
$495
138
kW-months/year
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,610
Cost:
$16,600
$11,569 180,768 $1,041 290 $11,569
180,768
kWh
$1,041
290
kW-months/year
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$429
Cost:
$294
$393 6,145 $36 10 $393
6,145
kWh
$36
10
kW-months/year
TOTAL RECOMMENDED Savings:
$127,970
Cost:
$125,364
$115,937 1,811,532 $12,033 3,352 $115,937
1,811,532
kWh
$12,033
3,352
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand