IAC Assessment: LE0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2014
Principal Product Laminated Windows and Window Frames
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 103,000
Annual Production 105,000 Pieces
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,456 4,234,050 kWh $0.07
Electricity Demand $22,237 10,730 kW-months/year $2.07
Electricity Fees $38,069 - $ -
Natural Gas $20,012 1,957 MMBtu $10.23
TOTAL ENERGY COSTS $377,774
RECOMMENDED SAVINGS* $42,448 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,302
Cost:
-
- - - - - - $6,302 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,302
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,973
Cost:
$1,000
$11,083 158,331 $890 430 - - - - - - $11,083
158,331
kWh
$890
430
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$794
Cost:
$450
$662 9,450 $132 64 - - - - - - $662
9,450
kWh
$132
64
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,600
Cost:
$2,185
- - - - $2,600 254 - - - - -
-
kWh
-
-
kW-months/year
$2,600
254
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$439
Cost:
$550
$375 5,350 $64 31 - - - - - - $375
5,350
kWh
$64
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,522
Cost:
$9,700
$7,228 103,251 $294 142 - - - - - - $7,228
103,251
kWh
$294
142
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,827
Cost:
$20,628
$6,547 93,533 $1,014 490 - - - - $266 - $6,547
93,533
kWh
$1,014
490
kW-months/year
-
-
MMBtu
-
-
$
$266
-
$
08: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$2,849
Cost:
$10,313
$2,737 39,102 $112 54 - - - - - - $2,737
39,102
kWh
$112
54
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,142
Cost:
$8,160
$1,386 19,802 $236 114 - - - - $520 - $1,386
19,802
kWh
$236
114
kW-months/year
-
-
MMBtu
-
-
$
$520
-
$
TOTAL RECOMMENDED Savings:
$42,448
Cost:
$52,986
$30,018 428,819 $2,742 1,325 $2,600 254 $6,302 - $786 - $30,018
428,819
kWh
$2,742
1,325
kW-months/year
$2,600
254
MMBtu
$6,302
-
$
$786
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost