Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2014 |
Principal Product | Converted Paper |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 165,000 |
Annual Production | 90 Thousand Feet |
Production Hrs. Annual | 6,864 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $335,858 | 3,042,200 | kWh | $0.11 |
Electricity Demand | $123,187 | 9,759 | kW-months/year | $12.62 |
Electricity Fees | $2,097 | - | $ | - |
Natural Gas | $390,544 | 65,292 | MMBtu | $5.98 |
TOTAL ENERGY COSTS | $851,686 | |||
RECOMMENDED SAVINGS* | $98,611 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,028 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,489 Cost: $40 |
$1,224 | 11,130 | $265 | 21 | - | - |
$1,224 11,130 kWh |
$265 21 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,539 Cost: $300 |
$3,719 | 33,807 | $820 | 65 | - | - |
$3,719 33,807 kWh |
$820 65 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $817 Cost: $220 |
$676 | 6,142 | $141 | 11 | - | - |
$676 6,142 kWh |
$141 11 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $54,956 Cost: $15,120 |
$37,667 | 342,426 | $17,289 | 1,370 | - | - |
$37,667 342,426 kWh |
$17,289 1,370 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,869 Cost: $5,500 |
$3,380 | 30,729 | $1,489 | 118 | - | - |
$3,380 30,729 kWh |
$1,489 118 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $18,711 Cost: $69,360 |
- | - | - | - | $18,711 | 3,129 |
- - kWh |
- - kW-months/year |
$18,711 3,129 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,230 Cost: $63,360 |
$8,649 | 78,624 | $4,581 | 363 | - | - |
$8,649 78,624 kWh |
$4,581 363 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,611 Cost: $153,900 |
$55,315 | 502,858 | $24,585 | 1,948 | $18,711 | 3,129 | $55,315 502,858 kWh |
$24,585 1,948 kW-months/year |
$18,711 3,129 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,028 Cost: $340 |
$4,943 | 44,937 | $1,085 | 86 | - | - | $4,943 44,937 kWh |
$1,085 86 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |