IAC logo
IAC Assessment: LE0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2014
Principal Product Instruments
NAICS 334514 - Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $100,000,000-$500,000,000
# of Employees 272
Plant Area (Sq.Ft.) 131,500
Annual Production 50,000 Pieces
Production Hrs. Annual 4,160
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $771,850 7,844,000 kWh $0.10
Electricity Demand $71,681 6,106 kW-months/year $11.74
Electricity Fees $6,074 - $ -
Natural Gas $10,664 947 MMBtu $11.26
TOTAL ENERGY COSTS $860,269
RECOMMENDED SAVINGS* $74,160 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,852
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,262
Cost:
$250
$1,086 11,079 $176 15 - - - - $1,086
11,079
kWh
$176
15
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,272
Cost:
$1,481
$1,689 17,239 $583 50 - - - - $1,689
17,239
kWh
$583
50
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$1,284
Cost:
$1,010
$1,284 13,100 - - - - - - $1,284
13,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,878
Cost:
$2,080
$1,183 12,073 $693 59 - - $2 - $1,183
12,073
kWh
$693
59
kW-months/year
-
-
MMBtu
$2
-
$
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$46,884
Cost:
$80,000
$46,661 476,130 $223 19 - - - - $46,661
476,130
kWh
$223
19
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,875
Cost:
$3,304
$1,357 13,844 $470 40 - - $48 - $1,357
13,844
kWh
$470
40
kW-months/year
-
-
MMBtu
$48
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,620
Cost:
$12,950
$1,427 14,560 $789 67 - - $404 - $1,427
14,560
kWh
$789
67
kW-months/year
-
-
MMBtu
$404
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,342
Cost:
$234
$3,342 34,104 - - - - - - $3,342
34,104
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,397
Cost:
$30,000
$1,755 17,909 $575 49 - - $3,067 - $1,755
17,909
kWh
$575
49
kW-months/year
-
-
MMBtu
$3,067
-
$
10: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$7,346
Cost:
$551,550
- - - - $7,346 652 - - -
-
kWh
-
-
kW-months/year
$7,346
652
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$74,160
Cost:
$682,859
$59,784 610,038 $3,509 299 $7,346 652 $3,521 - $59,784
610,038
kWh
$3,509
299
kW-months/year
$7,346
652
MMBtu
$3,521
-
$
TOTAL IMPLEMENTED Savings:
$22,852
Cost:
$599,519
$9,570 97,656 $2,417 206 $7,346 652 $3,519 - $9,570
97,656
kWh
$2,417
206
kW-months/year
$7,346
652
MMBtu
$3,519
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost