IAC Assessment: LE0389
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0389
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2015
Principal Product Commercial Heat Treat Services
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $5,000,000-$10,000,000
# of Employees 43
Plant Area (Sq.Ft.) 80,000
Annual Production 1,000 Units
Production Hrs. Annual 7,488
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,758 1,753,850 kWh $0.07
Electricity Demand $12,674 3,570 kW-months/year $3.55
Electricity Fees $5,508 - $ -
Natural Gas $323,634 61,637 MMBtu $5.25
TOTAL ENERGY COSTS $511,544
RECOMMENDED SAVINGS* $56,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,935
Cost:
$450
$1,725 23,958 $210 59 - - - - - - $1,725
23,958
kWh
$210
59
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,547
Cost:
$4,500
- - - - $8,547 1,628 - - - - -
-
kWh
-
-
kW-months/year
$8,547
1,628
MMBtu
-
-
gal
-
-
$
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$21,418
Cost:
$21,650
- - - - - - $21,418 714,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,418
714,000
gal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$642
Cost:
$1,000
$601 8,348 $41 11 - - - - - - $601
8,348
kWh
$41
11
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,458
Cost:
$81,373
$16,211 225,153 $1,097 309 - - - - $2,150 - $16,211
225,153
kWh
$1,097
309
kW-months/year
-
-
MMBtu
-
-
gal
$2,150
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,484
Cost:
$20,000
- - - - $4,484 854 - - - - -
-
kWh
-
-
kW-months/year
$4,484
854
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$56,484
Cost:
$128,973
$18,537 257,459 $1,348 380 $13,031 2,482 $21,418 714,000 $2,150 - $18,537
257,459
kWh
$1,348
380
kW-months/year
$13,031
2,482
MMBtu
$21,418
714,000
gal
$2,150
-
$
TOTAL IMPLEMENTED Savings:
$52,000
Cost:
$108,973
$18,537 257,459 $1,348 380 $8,547 1,628 $21,418 714,000 $2,150 - $18,537
257,459
kWh
$1,348
380
kW-months/year
$8,547
1,628
MMBtu
$21,418
714,000
gal
$2,150
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Ancillary Material Cost