IAC logo
IAC Assessment: LE0394
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0394
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2015
Principal Product Portuguese Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $1,000,000-$5,000,000
# of Employees 140
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000 Pounds
Production Hrs. Annual 8,736
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $462,332 6,257,776 kWh $0.07
Electricity Demand $46,817 13,151 kW-months/year $3.56
Electricity Fees $217,002 - $ -
Natural Gas $410,577 58,816 MMBtu $6.98
TOTAL ENERGY COSTS $1,136,728
RECOMMENDED SAVINGS* $113,824 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$65,897
Cost:
-
$1,790 24,189 - - $64,107 9,184 - - $1,790
24,189
kWh
-
-
kW-months/year
$64,107
9,184
MMBtu
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$16,261
Cost:
$75
- - - - $16,261 2,330 - - -
-
kWh
-
-
kW-months/year
$16,261
2,330
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,611
Cost:
$25
$3,387 45,777 $224 63 - - - - $3,387
45,777
kWh
$224
63
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$914
Cost:
$200
- - - - $914 131 - - -
-
kWh
-
-
kW-months/year
$914
131
MMBtu
-
-
$
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$11,973
Cost:
$5,000
- - - - $11,973 1,715 - - -
-
kWh
-
-
kW-months/year
$11,973
1,715
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,528
Cost:
$5,688
$2,806 37,914 $121 34 - - $601 - $2,806
37,914
kWh
$121
34
kW-months/year
-
-
MMBtu
$601
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$734
Cost:
$1,500
- - - - $734 105 - - -
-
kWh
-
-
kW-months/year
$734
105
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,987
Cost:
$4,340
$1,862 25,160 $125 35 - - - - $1,862
25,160
kWh
$125
35
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$8,298
Cost:
$20,000
- - - - $8,298 1,189 - - -
-
kWh
-
-
kW-months/year
$8,298
1,189
MMBtu
-
-
$
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$207
Cost:
$550
- - - - $207 30 - - -
-
kWh
-
-
kW-months/year
$207
30
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$415
Cost:
$1,615
$322 4,347 $71 20 - - $22 - $322
4,347
kWh
$71
20
kW-months/year
-
-
MMBtu
$22
-
$
TOTAL RECOMMENDED Savings:
$113,824
Cost:
$38,993
$10,166 137,387 $541 152 $102,494 14,684 $623 - $10,166
137,387
kWh
$541
152
kW-months/year
$102,494
14,684
MMBtu
$623
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost