IAC Assessment: LE0398
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0398
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2015
Principal Product High purity gases
NAICS 325120 - Industrial Gas Manufacturing
SIC 2813 - Industrial Gases
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 20,000
Annual Production 56,400 Pieces
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,906 2,622,780 kWh $0.09
Electricity Demand $32,155 4,877 kW-months/year $6.59
Electricity Fees $39,615 - $ -
Natural Gas $42,874 3,725 MMBtu $11.51
TOTAL ENERGY COSTS $340,550
RECOMMENDED SAVINGS* $78,226 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $903
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$21,570
Cost:
$12,000
$19,672 228,736 $1,898 285 - - - - $19,672
228,736
kWh
$1,898
285
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$903
Cost:
$525
$692 8,044 $211 32 - - - - $692
8,044
kWh
$211
32
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,761
Cost:
$2,125
$241 2,797 - - $2,521 219 - - $241
2,797
kWh
-
-
kW-months/year
$2,521
219
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,857
Cost:
$14,800
$11,972 139,213 $1,885 286 - - - - $11,972
139,213
kWh
$1,885
286
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$369
Cost:
$884
$323 3,756 $46 7 - - - - $323
3,756
kWh
$46
7
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$205
Cost:
$600
$205 2,387 - - - - - - $205
2,387
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,132
Cost:
$3,725
$987 11,482 $145 22 - - - - $987
11,482
kWh
$145
22
kW-months/year
-
-
MMBtu
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$29,538
Cost:
$129,220
$7,544 87,725 - - - - $21,994 - $7,544
87,725
kWh
-
-
kW-months/year
-
-
MMBtu
$21,994
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,157
Cost:
$27,450
$5,366 62,400 $791 120 - - - - $5,366
62,400
kWh
$791
120
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,733
Cost:
$8,550
$1,465 17,035 $268 41 - - - - $1,465
17,035
kWh
$268
41
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$78,226
Cost:
$199,879
$48,468 563,575 $5,243 793 $2,521 219 $21,994 - $48,468
563,575
kWh
$5,243
793
kW-months/year
$2,521
219
MMBtu
$21,994
-
$
TOTAL IMPLEMENTED Savings:
$903
Cost:
$525
$692 8,044 $211 32 - - - - $692
8,044
kWh
$211
32
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost