IAC logo
IAC Assessment: LE0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2015
Principal Product Waste Water treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 32
Plant Area (Sq.Ft.) 4,000,000
Annual Production 26,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $566,833 10,407,445 kWh $0.05
Electricity Demand $23,444 16,058 kW-months/year $1.46
Electricity Fees $39,323 - $ -
Natural Gas $154,761 15,136 MMBtu $10.22
TOTAL ENERGY COSTS $784,361
RECOMMENDED SAVINGS* $25,713 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,544
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,544
Cost:
$1,000
$1,488 27,562 $55 38 - - $1,488
27,562
kWh
$55
38
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,299
Cost:
$10,000
- - - - $9,299 909 -
-
kWh
-
-
kW-months/year
$9,299
909
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,349
Cost:
$6,500
$5,279 97,756 $70 48 - - $5,279
97,756
kWh
$70
48
kW-months/year
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,477
Cost:
$20,000
$5,157 95,504 $320 219 - - $5,157
95,504
kWh
$320
219
kW-months/year
-
-
MMBtu
05: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$4,044
Cost:
$20,000
$2,407 44,580 - - $1,637 160 $2,407
44,580
kWh
-
-
kW-months/year
$1,637
160
MMBtu
TOTAL RECOMMENDED Savings:
$25,713
Cost:
$57,500
$14,332 265,402 $445 305 $10,936 1,069 $14,332
265,402
kWh
$445
305
kW-months/year
$10,936
1,069
MMBtu
TOTAL IMPLEMENTED Savings:
$1,544
Cost:
$1,000
$1,488 27,562 $55 38 - - $1,488
27,562
kWh
$55
38
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas