IAC logo
IAC Assessment: LE0410
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0410
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2016
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 30
Plant Area (Sq.Ft.) 12,000
Annual Production 9,300 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $572,226 8,148,600 kWh $0.07
Electricity Demand $31,091 14,616 kW-months/year $2.13
Electricity Fees $69,709 - $ -
TOTAL ENERGY COSTS $673,026
RECOMMENDED SAVINGS* $369,226 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $369,226
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$63,492
Cost:
$80
$60,945 870,638 $2,547 1,196 $60,945
870,638
kWh
$2,547
1,196
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$77,576
Cost:
$400
$74,464 1,063,773 $3,112 1,461 $74,464
1,063,773
kWh
$3,112
1,461
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,237
Cost:
$5,320
$4,067 58,094 $170 80 $4,067
58,094
kWh
$170
80
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,755
Cost:
$5,880
$1,685 24,068 $70 33 $1,685
24,068
kWh
$70
33
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,739
Cost:
$7,770
$1,605 22,932 $134 63 $1,605
22,932
kWh
$134
63
kW-months/year
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,764
Cost:
$8,200
$1,556 22,230 $208 98 $1,556
22,230
kWh
$208
98
kW-months/year
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$218,663
Cost:
$1,120,000
$218,663 3,123,750 - - $218,663
3,123,750
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$369,226
Cost:
$1,147,650
$362,984 5,185,485 $6,242 2,931 $362,984
5,185,485
kWh
$6,242
2,931
kW-months/year
TOTAL IMPLEMENTED Savings:
$369,226
Cost:
$1,147,650
$362,984 5,185,485 $6,242 2,931 $362,984
5,185,485
kWh
$6,242
2,931
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand