Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2016 |
Principal Product | Remanufactured Engines |
NAICS | 333618 - Other Engine Equipment Manufacturing |
SIC | 3519 - Internal Combustion Engines, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 5,000 Pieces |
Production Hrs. Annual | 6,552 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $206,567 | 2,796,600 | kWh | $0.07 |
Electricity Demand | $36,389 | 8,680 | kW-months/year | $4.19 |
Electricity Fees | $22,005 | - | $ | - |
Natural Gas | $76,475 | 9,275 | MMBtu | $8.25 |
TOTAL ENERGY COSTS | $341,436 | |||
RECOMMENDED SAVINGS* | $40,522 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,486 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $13,984 Cost: $20,000 |
- | - | - | - | $13,984 | 1,695 |
- - kWh |
- - kW-months/year |
$13,984 1,695 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,397 Cost: $8,050 |
$2,770 | 37,434 | $2,627 | 627 | - | - |
$2,770 37,434 kWh |
$2,627 627 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,688 Cost: $19,250 |
$5,452 | 73,678 | $1,236 | 295 | - | - |
$5,452 73,678 kWh |
$1,236 295 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $462 Cost: $1,382 |
- | - | - | - | $462 | 56 |
- - kWh |
- - kW-months/year |
$462 56 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $4,944 Cost: $18,280 |
$4,533 | 61,260 | $411 | 98 | - | - |
$4,533 61,260 kWh |
$411 98 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,108 Cost: $4,125 |
$957 | 12,929 | $151 | 36 | - | - |
$957 12,929 kWh |
$151 36 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $7,939 Cost: $35,720 |
$6,690 | 90,410 | $1,249 | 298 | - | - |
$6,690 90,410 kWh |
$1,249 298 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,522 Cost: $106,807 |
$20,403 | 275,711 | $5,673 | 1,354 | $14,446 | 1,751 | $20,403 275,711 kWh |
$5,673 1,354 kW-months/year |
$14,446 1,751 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,486 Cost: $64,402 |
$14,913 | 201,522 | $5,112 | 1,220 | $462 | 56 | $14,913 201,522 kWh |
$5,112 1,220 kW-months/year |
$462 56 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |