IAC logo
IAC Assessment: LE0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2016
Principal Product Engine Parts
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales >$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 132,000
Annual Production 7,700,000 Pieces
Production Hrs. Annual 6,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,942,586 51,726,895 kWh $0.08
Electricity Demand $413,617 116,512 kW-months/year $3.55
Electricity Fees $154,844 - $ -
Natural Gas $535,036 105,897 MMBtu $5.05
TOTAL ENERGY COSTS $5,046,083
RECOMMENDED SAVINGS* $1,545,976 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,476,986
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,199
Cost:
-
$1,128 14,845 $71 20 - - - - $1,128
14,845
kWh
$71
20
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$60,481
Cost:
$15,000
$56,835 747,832 $3,646 1,027 - - - - $56,835
747,832
kWh
$3,646
1,027
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$317,839
Cost:
$125,000
$298,676 3,929,949 $19,163 5,398 - - - - $298,676
3,929,949
kWh
$19,163
5,398
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,759
Cost:
$6,000
$7,291 95,929 $469 132 - - - - $7,291
95,929
kWh
$469
132
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,116,268
Cost:
$1,540,000
$1,081,571 14,231,193 $34,698 9,774 - - - - $1,081,571
14,231,193
kWh
$34,698
9,774
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,905
Cost:
$12,000
$7,429 97,756 $476 134 - - - - $7,429
97,756
kWh
$476
134
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,745
Cost:
$13,000
$4,458 58,654 $288 81 - - - - $4,458
58,654
kWh
$288
81
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,764
Cost:
$11,250
$2,988 39,312 $383 108 - - $393 - $2,988
39,312
kWh
$383
108
kW-months/year
-
-
MMBtu
$393
-
$
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$26,015
Cost:
$127,400
$24,266 319,283 $2,517 709 $(-768) (-152) - - $24,266
319,283
kWh
$2,517
709
kW-months/year
$(-768)
(-152)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,545,976
Cost:
$1,849,650
$1,484,641 19,534,753 $61,710 17,383 $(-768) (-152) $393 - $1,484,641
19,534,753
kWh
$61,710
17,383
kW-months/year
$(-768)
(-152)
MMBtu
$393
-
$
TOTAL IMPLEMENTED Savings:
$1,476,986
Cost:
$1,810,400
$1,420,361 18,688,955 $57,393 16,167 $(-768) (-152) - - $1,420,361
18,688,955
kWh
$57,393
16,167
kW-months/year
$(-768)
(-152)
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $