Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2017 |
Principal Product | Bronze Casting |
NAICS | 331529 - Other Nonferrous Metal Foundries (except Die-Casting) |
SIC | 3369 - Nonferrous Foundries, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 49 |
Plant Area (Sq.Ft.) | 44,000 |
Annual Production | 2,000 Units |
Production Hrs. Annual | 2,450 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $200,814 | 2,533,108 | kWh | $0.08 |
Electricity Demand | $116,286 | 20,322 | kW-months/year | $5.72 |
Electricity Fees | $41,650 | - | $ | - |
Natural Gas | $26,480 | 2,672 | MMBtu | $9.91 |
TOTAL ENERGY COSTS | $385,230 | |||
RECOMMENDED SAVINGS* | $11,966 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,673 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,923 Cost: $1,000 |
$1,208 | 15,296 | $715 | 125 | - | - |
$1,208 15,296 kWh |
$715 125 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $340 Cost: $800 |
$214 | 2,713 | $126 | 22 | - | - |
$214 2,713 kWh |
$126 22 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,953 Cost: $9,500 |
$2,797 | 35,409 | $1,155 | 202 | - | - |
$2,797 35,409 kWh |
$1,155 202 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,863 Cost: $10,608 |
$2,114 | 26,754 | $749 | 131 | - | - |
$2,114 26,754 kWh |
$749 131 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $769 Cost: $3,192 |
$569 | 7,203 | $200 | 35 | - | - |
$569 7,203 kWh |
$200 35 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $2,118 Cost: $10,500 |
$(-339) | (-4,290) | $(-229) | (-40) | $2,686 | 271 |
$(-339) (-4,290) kWh |
$(-229) (-40) kW-months/year |
$2,686 271 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,966 Cost: $35,600 |
$6,563 | 83,085 | $2,717 | 475 | $2,686 | 271 | $6,563 83,085 kWh |
$2,717 475 kW-months/year |
$2,686 271 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,673 Cost: $25,300 |
$3,552 | 44,963 | $1,436 | 251 | $2,686 | 271 | $3,552 44,963 kWh |
$1,436 251 kW-months/year |
$2,686 271 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |