IAC logo
IAC Assessment: LE0437
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0437
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2017
Principal Product Vessel parts and mod systems
NAICS 336611 - Ship Building and Repairing
SIC 3731 - Ship Building And Repairing
Sales $1,000,000-$5,000,000
# of Employees 23
Plant Area (Sq.Ft.) 65,000
Annual Production 50,000 Units
Production Hrs. Annual 3,120
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $839,313 8,371,368 kWh $0.10
Electricity Fees $44,174 - $ -
TOTAL ENERGY COSTS $883,487
RECOMMENDED SAVINGS* $238,808 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$12,220
Cost:
$7,000
$12,220 122,195 - - $12,220
122,195
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,208
Cost:
$20,000
$26,208 262,080 - - $26,208
262,080
kWh
-
-
$
03: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$37,770
Cost:
$36,000
$(-12,230) (-122,304) $50,000 - $(-12,230)
(-122,304)
kWh
$50,000
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,482
Cost:
$14,000
$11,482 114,824 - - $11,482
114,824
kWh
-
-
$
05: 2.3522 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES Savings:
$35,693
Cost:
$50,000
$35,693 356,926 - - $35,693
356,926
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,862
Cost:
$12,000
$7,862 78,624 - - $7,862
78,624
kWh
-
-
$
07: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS Savings:
$86,210
Cost:
$200,000
$86,210 862,105 - - $86,210
862,105
kWh
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$21,363
Cost:
$60,000
$21,363 213,632 - - $21,363
213,632
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$238,808
Cost:
$399,000
$188,808 1,888,082 $50,000 - $188,808
1,888,082
kWh
$50,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes