IAC Assessment: LE0443
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0443
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2017
Principal Product Pharmaceuticals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $1,000,000-$5,000,000
# of Employees 616
Plant Area (Sq.Ft.) 200,000
Annual Production 175,000,000 Units
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,526,414 28,567,224 kWh $0.05
Electricity Demand $120,844 55,121 kW-months/year $2.19
Electricity Fees $79,380 - $ -
Natural Gas $569,894 147,778 MMBtu $3.86
TOTAL ENERGY COSTS $2,296,532
RECOMMENDED SAVINGS* $574,772 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $139,316
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,762
Cost:
$1,000
$7,191 135,677 $571 261 - - - - $7,191
135,677
kWh
$571
261
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,930
Cost:
$8,000
$10,127 191,070 $803 367 - - - - $10,127
191,070
kWh
$803
367
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,156
Cost:
$8,000
$8,482 160,036 $674 308 - - - - $8,482
160,036
kWh
$674
308
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,373
Cost:
$5,300
$4,051 76,428 $322 147 - - - - $4,051
76,428
kWh
$322
147
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61,512
Cost:
$97,637
$56,983 1,075,152 $4,529 2,068 - - - - $56,983
1,075,152
kWh
$4,529
2,068
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46,572
Cost:
$108,715
$43,145 814,058 $3,427 1,565 - - - - $43,145
814,058
kWh
$3,427
1,565
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,458
Cost:
$8,500
$3,213 60,613 $245 112 - - - - $3,213
60,613
kWh
$245
112
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,903
Cost:
$9,500
$2,640 49,807 $263 120 - - - - $2,640
49,807
kWh
$263
120
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,710
Cost:
$37,500
$9,922 187,200 $788 360 - - - - $9,922
187,200
kWh
$788
360
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$385,040
Cost:
$1,360,000
$230,708 4,352,980 $18,332 8,371 - - $136,000 - $230,708
4,352,980
kWh
$18,332
8,371
kW-months/year
-
-
MMBtu
$136,000
-
$
11: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$8,886
Cost:
$32,000
- - - - $8,886 2,302 - - -
-
kWh
-
-
kW-months/year
$8,886
2,302
MMBtu
-
-
$
12: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$14,690
Cost:
$63,000
$12,255 231,230 $2,435 1,112 - - - - $12,255
231,230
kWh
$2,435
1,112
kW-months/year
-
-
MMBtu
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,256
Cost:
$10,938
$2,026 38,220 $230 105 - - - - $2,026
38,220
kWh
$230
105
kW-months/year
-
-
MMBtu
-
-
$
14: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,524
Cost:
$32,000
$5,442 102,685 $1,082 494 - - - - $5,442
102,685
kWh
$1,082
494
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$574,772
Cost:
$1,782,090
$396,185 7,475,156 $33,701 15,390 $8,886 2,302 $136,000 - $396,185
7,475,156
kWh
$33,701
15,390
kW-months/year
$8,886
2,302
MMBtu
$136,000
-
$
TOTAL IMPLEMENTED Savings:
$139,316
Cost:
$313,290
$127,042 2,397,022 $12,274 5,605 - - - - $127,042
2,397,022
kWh
$12,274
5,605
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes