Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2019 |
Principal Product | Zinc Die Casting |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3364 - Nonferrous Die-casting Exc. Aluminum |
Sales | $10,000,000-$50,000,000 |
# of Employees | 83 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 5,000,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $168,089 | 1,606,336 | kWh | $0.10 |
Electricity Demand | $61,260 | 7,006 | kW-months/year | $8.74 |
Electricity Fees | $7,204 | - | $ | - |
Natural Gas | $161,814 | 19,022 | MMBtu | $8.51 |
TOTAL ENERGY COSTS | $398,367 | |||
RECOMMENDED SAVINGS* | $78,506 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,883 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $825 Cost: $70 |
$272 | 2,592 | - | - | $553 | 65 | - | - |
$272 2,592 kWh |
- - kW-months/year |
$553 65 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $40,407 Cost: $37,000 |
$33,896 | 322,820 | $6,511 | 745 | - | - | - | - |
$33,896 322,820 kWh |
$6,511 745 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,990 Cost: $2,000 |
$1,789 | 17,038 | $201 | 23 | - | - | - | - |
$1,789 17,038 kWh |
$201 23 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,116 Cost: $6,000 |
$2,644 | 25,178 | $472 | 54 | - | - | - | - |
$2,644 25,178 kWh |
$472 54 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $14,748 Cost: $50,000 |
- | - | - | - | $14,748 | 1,733 | - | - |
- - kWh |
- - kW-months/year |
$14,748 1,733 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $9,352 Cost: $35,000 |
- | - | - | - | $9,352 | 1,099 | - | - |
- - kWh |
- - kW-months/year |
$9,352 1,099 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,568 Cost: $30,054 |
$6,432 | 61,256 | $1,136 | 130 | - | - | - | - |
$6,432 61,256 kWh |
$1,136 130 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $500 Cost: $5,000 |
- | - | - | - | - | - | $500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,506 Cost: $165,124 |
$45,033 | 428,884 | $8,320 | 952 | $24,653 | 2,897 | $500 | - | $45,033 428,884 kWh |
$8,320 952 kW-months/year |
$24,653 2,897 MMBtu |
$500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,883 Cost: $37,124 |
$8,493 | 80,886 | $1,337 | 153 | $553 | 65 | $500 | - | $8,493 80,886 kWh |
$1,337 153 kW-months/year |
$553 65 MMBtu |
$500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |