IAC logo
IAC Assessment: LE0474
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0474
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2019
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $100,000,000-$500,000,000
# of Employees 78
Plant Area (Sq.Ft.) 395,000
Annual Production 65,000,000 Units
Production Hrs. Annual 8,736
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,761,173 23,700,301 kWh $0.07
Electricity Demand $483,912 51,228 kW-months/year $9.45
Electricity Fees $580,705 - $ -
Natural Gas $709,545 102,830 MMBtu $6.90
TOTAL ENERGY COSTS $3,535,335
RECOMMENDED SAVINGS* $350,549 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,222
Cost:
-
$1,123 15,178 - - $5,099 739 - - $1,123
15,178
kWh
-
-
kW-months/year
$5,099
739
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,754
Cost:
$20,000
$25,736 347,781 $5,018 531 - - - - $25,736
347,781
kWh
$5,018
531
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$28,595
Cost:
$35,000
$23,747 320,904 $4,848 513 - - - - $23,747
320,904
kWh
$4,848
513
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$17,687
Cost:
$22,000
$15,050 203,374 $2,637 279 - - - - $15,050
203,374
kWh
$2,637
279
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$73,547
Cost:
$220,000
- - - - $73,547 10,659 - - -
-
kWh
-
-
kW-months/year
$73,547
10,659
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,789
Cost:
$6,400
$1,222 16,511 $567 60 - - - - $1,222
16,511
kWh
$567
60
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$150,418
Cost:
$721,000
$117,456 1,587,239 $32,962 3,488 - - - - $117,456
1,587,239
kWh
$32,962
3,488
kW-months/year
-
-
MMBtu
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$41,537
Cost:
$280,000
$10,211 137,986 - - - - $31,326 - $10,211
137,986
kWh
-
-
kW-months/year
-
-
MMBtu
$31,326
-
$
TOTAL RECOMMENDED Savings:
$350,549
Cost:
$1,304,400
$194,545 2,628,973 $46,032 4,871 $78,646 11,398 $31,326 - $194,545
2,628,973
kWh
$46,032
4,871
kW-months/year
$78,646
11,398
MMBtu
$31,326
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes