IAC logo
IAC Assessment: LE0477
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0477
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2019
Principal Product Refrigeration Machines
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 150,000
Annual Production 30 Units
Production Hrs. Annual 5,712
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $419,653 7,089,562 kWh $0.06
Electricity Demand $21,923 8,769 kW-months/year $2.50
Electricity Fees $15,455 - $ -
Natural Gas $255,805 48,265 MMBtu $5.30
TOTAL ENERGY COSTS $712,836
RECOMMENDED SAVINGS* $55,058 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,624
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,091
Cost:
-
$9,047 153,342 $44 18 - - $9,047
153,342
kWh
$44
18
kW-months/year
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$179
Cost:
$80
$161 2,737 $18 7 - - $161
2,737
kWh
$18
7
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,343
Cost:
$40,000
$19,225 325,853 $1,118 447 - - $19,225
325,853
kWh
$1,118
447
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,531
Cost:
$5,300
$1,175 19,918 $138 55 $218 - $1,175
19,918
kWh
$138
55
kW-months/year
$218
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$23,914
Cost:
$96,000
$20,359 345,072 $3,555 1,422 - - $20,359
345,072
kWh
$3,555
1,422
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$55,058
Cost:
$141,380
$49,967 846,922 $4,873 1,949 $218 - $49,967
846,922
kWh
$4,873
1,949
kW-months/year
$218
-
$
TOTAL IMPLEMENTED Savings:
$25,624
Cost:
$101,380
$21,695 367,727 $3,711 1,484 $218 - $21,695
367,727
kWh
$3,711
1,484
kW-months/year
$218
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost