Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2019 |
Principal Product | Hydraulic Turbines |
NAICS | 333511 - Industrial Mold Manufacturing |
SIC | 3511 - Turbines And Turbine Generator Sets |
Sales | $1,000,000-$5,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 40 Units |
Production Hrs. Annual | 6,240 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $370,636 | 7,338,110 | kWh | $0.05 |
Electricity Demand | $70,165 | 20,450 | kW-months/year | $3.43 |
Electricity Fees | $52,210 | - | $ | - |
Natural Gas | $173,129 | 26,230 | MMBtu | $6.60 |
TOTAL ENERGY COSTS | $666,140 | |||
RECOMMENDED SAVINGS* | $53,352 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,351 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $339 Cost: $310 |
$106 | 2,150 | $233 | 68 | - | - |
$106 2,150 kWh |
$233 68 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,431 Cost: $9,000 |
- | - | - | - | $9,431 | 1,429 |
- - kWh |
- - kW-months/year |
$9,431 1,429 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $20,437 Cost: $22,500 |
$(-447) | (-8,728) | - | - | $20,884 | 3,164 |
$(-447) (-8,728) kWh |
- - kW-months/year |
$20,884 3,164 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,667 Cost: $6,000 |
$3,372 | 65,170 | $295 | 86 | - | - |
$3,372 65,170 kWh |
$295 86 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $1,469 Cost: $3,500 |
$1,469 | 28,799 | - | - | - | - |
$1,469 28,799 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $34 Cost: $105 |
$34 | 657 | - | - | - | - |
$34 657 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,351 Cost: $15,513 |
$2,867 | 56,223 | $484 | 141 | - | - |
$2,867 56,223 kWh |
$484 141 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $14,624 Cost: $75,000 |
$11,619 | 227,816 | $3,005 | 876 | - | - |
$11,619 227,816 kWh |
$3,005 876 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,352 Cost: $131,928 |
$19,020 | 372,087 | $4,017 | 1,171 | $30,315 | 4,593 | $19,020 372,087 kWh |
$4,017 1,171 kW-months/year |
$30,315 4,593 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,351 Cost: $15,513 |
$2,867 | 56,223 | $484 | 141 | - | - | $2,867 56,223 kWh |
$484 141 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |