IAC logo
IAC Assessment: LE0492
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0492
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2020
Principal Product Cosmetics
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $100,000,000-$500,000,000
# of Employees 30
Plant Area (Sq.Ft.) 62,000
Annual Production 503 Tons
Production Hrs. Annual 5,200
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,619 2,614,091 kWh $0.06
Electricity Demand $37,593 7,860 kW-months/year $4.78
Electricity Fees $6,484 - $ -
Natural Gas $28,363 3,184 MMBtu $8.91
TOTAL ENERGY COSTS $241,059
RECOMMENDED SAVINGS* $55,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,371
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,779
Cost:
$3,520
$3,557 54,720 $3,222 674 - - $3,557
54,720
kWh
$3,222
674
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,071
Cost:
$22,500
$26,476 407,316 $3,595 752 - - $26,476
407,316
kWh
$3,595
752
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,415
Cost:
$6,000
- - - - $6,415 720 -
-
kWh
-
-
kW-months/year
$6,415
720
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,255
Cost:
$2,500
$1,916 29,480 $339 71 - - $1,916
29,480
kWh
$339
71
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,434
Cost:
$5,800
$2,937 45,181 $497 104 - - $2,937
45,181
kWh
$497
104
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,300
Cost:
$8,123
$1,965 30,233 $335 70 - - $1,965
30,233
kWh
$335
70
kW-months/year
-
-
MMBtu
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,220
Cost:
$17,000
$3,833 58,968 $387 81 - - $3,833
58,968
kWh
$387
81
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$55,474
Cost:
$65,443
$40,684 625,898 $8,375 1,752 $6,415 720 $40,684
625,898
kWh
$8,375
1,752
kW-months/year
$6,415
720
MMBtu
TOTAL IMPLEMENTED Savings:
$32,371
Cost:
$30,623
$28,441 437,549 $3,930 822 - - $28,441
437,549
kWh
$3,930
822
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas