Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: LE0494
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: LE0494
IAC Center Lehigh University
Assessment Year
Principal Product Rods and wires
NAICS 331420 - Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351 - Copper Rolling And Drawing
Sales $100,000,000
# of Employees 33
Plant Area (Sq.Ft.) 120,000
Annual Production 5,500,000 Units
Production Hrs. Annual 6,120
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $793,798 17,179,211 kWh $0.05
Electricity Demand $99,817 33,492 kW/month $2.98
Electricity Fees $30,314 - $ -
Natural Gas $297,739 45,135 MMBtu $6.60
TOTAL ENERGY COSTS $1,221,668
RECOMMENDED SAVINGS* $80,958 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW/month $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,038
Cost:
$1,620
$741 16,103 - - $2,297 348 $741
16,103
kWh
-
-
kW/month
$2,297
348
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,651
Cost:
$13,000
$19,277 419,065 $1,374 461 - - $19,277
419,065
kWh
$1,374
461
kW/month
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,586
Cost:
$11,000
$9,883 214,848 $703 236 - - $9,883
214,848
kWh
$703
236
kW/month
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,225
Cost:
$8,000
$6,745 146,633 $480 161 - - $6,745
146,633
kWh
$480
161
kW/month
-
-
MMBtu
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$22,684
Cost:
$35,000
- - - - $22,684 3,437 -
-
kWh
-
-
kW/month
$22,684
3,437
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,199
Cost:
$10,000
$2,838 61,690 $361 121 - - $2,838
61,690
kWh
$361
121
kW/month
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,702
Cost:
$43,257
$7,528 163,655 $1,174 394 - - $7,528
163,655
kWh
$1,174
394
kW/month
-
-
MMBtu
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,873
Cost:
$27,900
$4,137 89,940 $736 247 - - $4,137
89,940
kWh
$736
247
kW/month
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$80,958
Cost:
$149,777
$51,149 1,111,934 $4,828 1,620 $24,981 3,785 $51,149
1,111,934
kWh
$4,828
1,620
kW/month
$24,981
3,785
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW/month
-
-
MMBtu
Savings
Cost
$ kWh $ kW/month $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas