IAC logo
IAC Assessment: LE0496
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0496
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2020
Principal Product Metal Fabricated Enclosures
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3291 - Abrasive Products
Sales $100,000,000-$500,000,000
# of Employees 166
Plant Area (Sq.Ft.) 440,000
Annual Production 500,000 Units
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,298 5,499,608 kWh $0.04
Electricity Demand $74,679 13,993 kW-months/year $5.34
Electricity Fees $332,394 - $ -
Natural Gas $151,105 21,314 MMBtu $7.09
TOTAL ENERGY COSTS $788,476
RECOMMENDED SAVINGS* $53,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$30,000
Cost:
-
- - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,000
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,682
Cost:
-
$1,105 26,325 $577 108 - - - - $1,105
26,325
kWh
$577
108
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,482
Cost:
$3,000
$1,955 46,550 $1,527 286 - - - - $1,955
46,550
kWh
$1,527
286
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,545
Cost:
$5,000
- - - - $3,545 500 - - -
-
kWh
-
-
kW-months/year
$3,545
500
MMBtu
-
-
$
05: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$1,393
Cost:
$3,150
$1,121 26,681 $272 51 - - - - $1,121
26,681
kWh
$272
51
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,207
Cost:
$3,300
$977 23,275 $230 43 - - - - $977
23,275
kWh
$230
43
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,578
Cost:
$29,000
$4,874 116,052 $1,704 319 - - - - $4,874
116,052
kWh
$1,704
319
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,991
Cost:
$9,200
$1,553 36,972 $438 82 - - - - $1,553
36,972
kWh
$438
82
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$3,150
Cost:
$18,250
$1,650 39,285 $2,748 331 $(-1,248) (-176) - - $1,650
39,285
kWh
$2,748
331
kW-months/year
$(-1,248)
(-176)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$53,028
Cost:
$70,900
$13,235 315,140 $7,496 1,220 $2,297 324 $30,000 - $13,235
315,140
kWh
$7,496
1,220
kW-months/year
$2,297
324
MMBtu
$30,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes