IAC logo
IAC Assessment: LE0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2021
Principal Product PVD Coatings
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 23
Plant Area (Sq.Ft.) 23,000
Annual Production 600,000 Units
Production Hrs. Annual 4,862
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,857 1,234,400 kWh $0.07
Electricity Demand $19,232 3,009 kW-months/year $6.39
Electricity Fees $20,252 - $ -
Natural Gas $11,867 1,003 MMBtu $11.83
TOTAL ENERGY COSTS $141,208
RECOMMENDED SAVINGS* $19,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,535
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,620
Cost:
$40
$1,620 22,200 - - - - - - $1,620
22,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,539
Cost:
$140
$735 10,067 - - $804 68 - - $735
10,067
kWh
-
-
kW-months/year
$804
68
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,505
Cost:
$250
- - - - - - $1,505 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,505
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$4,332
Cost:
$5,500
$3,444 47,184 $888 139 - - - - $3,444
47,184
kWh
$888
139
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,926
Cost:
$6,500
$5,831 79,872 $1,667 261 $(-3,572) (-302) - - $5,831
79,872
kWh
$1,667
261
kW-months/year
$(-3,572)
(-302)
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,579
Cost:
$4,500
$1,678 22,984 $901 141 - - - - $1,678
22,984
kWh
$901
141
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,539
Cost:
$13,136
$2,862 39,205 $677 106 - - - - $2,862
39,205
kWh
$677
106
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,040
Cost:
$30,066
$16,170 221,512 $4,133 647 $(-2,768) (-234) $1,505 - $16,170
221,512
kWh
$4,133
647
kW-months/year
$(-2,768)
(-234)
MMBtu
$1,505
-
$
TOTAL IMPLEMENTED Savings:
$17,535
Cost:
$29,816
$16,170 221,512 $4,133 647 $(-2,768) (-234) - - $16,170
221,512
kWh
$4,133
647
kW-months/year
$(-2,768)
(-234)
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes