Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2021 |
Principal Product | Surfactants |
NAICS | 325611 - Soap and Other Detergent Manufacturing |
SIC | 2841 - Soap And Other Detergents |
Sales | $10,000,000-$50,000,000 |
# of Employees | 39 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 186,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,263,418 | 15,743,391 | kWh | $0.08 |
Electricity Demand | $60,550 | 27,999 | kW-months/year | $2.16 |
Electricity Fees | $149,912 | - | $ | - |
Natural Gas | $728,880 | 139,722 | MMBtu | $5.22 |
TOTAL ENERGY COSTS | $2,202,760 | |||
RECOMMENDED SAVINGS* | $308,099 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $256,384 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $72,824 Cost: $26,000 |
- | - | - | - | $72,824 | 13,951 |
- - kWh |
- - kW-months/year |
$72,824 13,951 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $16,651 Cost: $10,100 |
$16,172 | 202,149 | $479 | 222 | - | - |
$16,172 202,149 kWh |
$479 222 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $39,439 Cost: $31,000 |
$38,029 | 475,362 | $1,410 | 653 | - | - |
$38,029 475,362 kWh |
$1,410 653 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $62,020 Cost: $55,000 |
$59,804 | 747,544 | $2,216 | 1,026 | - | - |
$59,804 747,544 kWh |
$2,216 1,026 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,327 Cost: $20,855 |
$16,707 | 208,834 | $620 | 287 | - | - |
$16,707 208,834 kWh |
$620 287 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $48,123 Cost: $90,000 |
- | - | - | - | $48,123 | 9,219 |
- - kWh |
- - kW-months/year |
$48,123 9,219 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $51,715 Cost: $200,000 |
- | - | - | - | $51,715 | 9,907 |
- - kWh |
- - kW-months/year |
$51,715 9,907 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $308,099 Cost: $432,955 |
$130,712 | 1,633,889 | $4,725 | 2,188 | $172,662 | 33,077 | $130,712 1,633,889 kWh |
$4,725 2,188 kW-months/year |
$172,662 33,077 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $256,384 Cost: $232,955 |
$130,712 | 1,633,889 | $4,725 | 2,188 | $120,947 | 23,170 | $130,712 1,633,889 kWh |
$4,725 2,188 kW-months/year |
$120,947 23,170 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |