Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2021 |
Principal Product | Tire Retreading |
NAICS | 326212 - Tire Retreading |
SIC | 3011 - Tires And Inner Tubes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 95,000 |
Annual Production | 85,000 Units |
Production Hrs. Annual | 4,420 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $131,488 | 1,851,000 | kWh | $0.07 |
Electricity Demand | $18,487 | 5,282 | kW-months/year | $3.50 |
Electricity Fees | $4,033 | - | $ | - |
Natural Gas | $91,507 | 12,497 | MMBtu | $7.32 |
TOTAL ENERGY COSTS | $245,515 | |||
RECOMMENDED SAVINGS* | $167,219 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $157,618 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Increase in Production | Electricity Usage | Electricity Demand | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,213 Cost: - |
$1,929 | 27,164 | $284 | 81 | - | - |
$1,929 27,164 kWh |
$284 81 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,306 Cost: $1,500 |
$2,011 | 28,316 | $295 | 84 | - | - |
$2,011 28,316 kWh |
$295 84 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,441 Cost: $1,500 |
$1,255 | 17,685 | $186 | 53 | - | - |
$1,255 17,685 kWh |
$186 53 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,979 Cost: $10,500 |
$7,918 | 111,527 | $1,061 | 303 | - | - |
$7,918 111,527 kWh |
$1,061 303 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,658 Cost: $6,990 |
$1,462 | 20,597 | $196 | 56 | - | - |
$1,462 20,597 kWh |
$196 56 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $150,000 Cost: $700,000 |
- | - | - | - | $150,000 | - |
- - kWh |
- - kW-months/year |
$150,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $622 Cost: $3,000 |
$584 | 8,223 | $38 | 11 | - | - |
$584 8,223 kWh |
$38 11 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $167,219 Cost: $723,490 |
$15,159 | 213,512 | $2,060 | 588 | $150,000 | - | $15,159 213,512 kWh |
$2,060 588 kW-months/year |
$150,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $157,618 Cost: $709,990 |
$6,657 | 93,762 | $961 | 274 | $150,000 | - | $6,657 93,762 kWh |
$961 274 kW-months/year |
$150,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Increase in Production | Electricity Usage | Electricity Demand | Increase in Production |