Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2022 |
Principal Product | Metal Cabinets |
NAICS | 337214 - Office Furniture (except Wood) Manufacturing |
SIC | 2522 - Office Furniture, Except Wood |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 75,000,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $99,080 | 1,578,750 | kWh | $0.06 |
Electricity Demand | $19,891 | 4,996 | kW-months/year | $3.98 |
Electricity Fees | $2,062 | - | $ | - |
Natural Gas | $134,200 | 22,829 | MMBtu | $5.88 |
TOTAL ENERGY COSTS | $288,833 | |||
RECOMMENDED SAVINGS* | $56,186 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,356 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $672 Cost: - |
- | - | - | - | $672 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$672 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,840 Cost: $380 |
$363 | 5,759 | - | - | - | - | $2,477 | 421 | - | - |
$363 5,759 kWh |
- - kW-months/year |
- - $ |
$2,477 421 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,176 Cost: $2,600 |
$5,324 | 84,367 | $852 | 216 | - | - | - | - | - | - |
$5,324 84,367 kWh |
$852 216 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT |
Savings: $36,631 Cost: $65,000 |
- | - | - | - | - | - | $2,831 | 481 | $33,800 | 71,656 |
- - kWh |
- - kW-months/year |
- - $ |
$2,831 481 MMBtu |
$33,800 71,656 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,439 Cost: $4,040 |
$1,238 | 19,656 | $201 | 50 | - | - | - | - | - | - |
$1,238 19,656 kWh |
$201 50 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $901 Cost: $2,000 |
$775 | 12,307 | $126 | 32 | - | - | - | - | - | - |
$775 12,307 kWh |
$126 32 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,405 Cost: $16,445 |
$4,449 | 70,616 | $956 | 240 | - | - | - | - | - | - |
$4,449 70,616 kWh |
$956 240 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $2,122 Cost: $12,028 |
- | - | - | - | - | - | $2,122 | 361 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,122 361 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,186 Cost: $102,493 |
$12,149 | 192,705 | $2,135 | 538 | $672 | - | $7,430 | 1,263 | $33,800 | 71,656 | $12,149 192,705 kWh |
$2,135 538 kW-months/year |
$672 - $ |
$7,430 1,263 MMBtu |
$33,800 71,656 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,356 Cost: $9,020 |
$7,700 | 122,089 | $1,179 | 298 | - | - | $2,477 | 421 | - | - | $7,700 122,089 kWh |
$1,179 298 kW-months/year |
- - $ |
$2,477 421 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) |