IAC Assessment: LE0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2022
Principal Product Recycled paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $100,000,000-$500,000,000
# of Employees 78
Plant Area (Sq.Ft.) 240,000
Annual Production 322,120 Tons
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,661,563 80,145,784 kWh $0.05
Electricity Demand $124,000 129,169 kW-months/year $0.96
Electricity Fees $185,700 - $ -
Natural Gas $5,011,370 932,753 MMBtu $5.37
TOTAL ENERGY COSTS $11,265,702
RECOMMENDED SAVINGS* $2,541,734 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $609,889
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,559
Cost:
$100
$2,487 54,053 $72 75 - - - - - - - - $2,487
54,053
kWh
$72
75
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$131,350
Cost:
$40,000
- - - - $131,350 24,460 - - - - - - -
-
kWh
-
-
kW-months/year
$131,350
24,460
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,133
Cost:
$7,750
$16,655 362,058 $478 498 - - - - - - - - $16,655
362,058
kWh
$478
498
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,786
Cost:
$5,740
$9,533 207,242 $253 264 - - - - - - - - $9,533
207,242
kWh
$253
264
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$29,876
Cost:
$25,340
$29,044 631,388 $832 867 - - - - - - - - $29,044
631,388
kWh
$832
867
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,341
Cost:
$2,100
$2,276 49,453 $65 68 - - - - - - - - $2,276
49,453
kWh
$65
68
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
07: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$247,341
Cost:
$500,000
- - - - $35,957 6,696 - - $135,648 11,304 $75,736 - -
-
kWh
-
-
kW-months/year
$35,957
6,696
MMBtu
-
-
Tgal
$135,648
11,304
Tgal
$75,736
-
Tgal
08: 3.1181 ELIMINATE A BY-PRODUCT Savings:
$1,467,534
Cost:
$3,000,000
$(-162,042) (-3,424,512) - - $219,919 40,767 $505,064 75,383 $904,593 75,383 - - $(-162,042)
(-3,424,512)
kWh
-
-
kW-months/year
$219,919
40,767
MMBtu
$505,064
75,383
Tgal
$904,593
75,383
Tgal
-
-
Tgal
09: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$166,416
Cost:
$500,000
- - - - $29,191 5,346 $49,166 7,338 $88,059 7,338 - - -
-
kWh
-
-
kW-months/year
$29,191
5,346
MMBtu
$49,166
7,338
Tgal
$88,059
7,338
Tgal
-
-
Tgal
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,992
Cost:
$24,000
- - - - $5,992 1,116 - - - - - - -
-
kWh
-
-
kW-months/year
$5,992
1,116
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
11: 2.1224 REPLACE BOILER Savings:
$461,406
Cost:
$4,000,000
- - - - $461,406 85,923 - - - - - - -
-
kWh
-
-
kW-months/year
$461,406
85,923
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$2,541,734
Cost:
$8,105,030
$(-102,047) (-2,120,318) $1,700 1,772 $883,815 164,308 $554,230 82,721 $1,128,300 94,025 $75,736 - $(-102,047)
(-2,120,318)
kWh
$1,700
1,772
kW-months/year
$883,815
164,308
MMBtu
$554,230
82,721
Tgal
$1,128,300
94,025
Tgal
$75,736
-
Tgal
TOTAL IMPLEMENTED Savings:
$609,889
Cost:
$4,047,750
$16,655 362,058 $478 498 $592,756 110,383 - - - - - - $16,655
362,058
kWh
$478
498
kW-months/year
$592,756
110,383
MMBtu
-
-
Tgal
-
-
Tgal
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Water Consumption