Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2022 |
Principal Product | Machined Parts |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 5 |
Plant Area (Sq.Ft.) | 23,000 |
Annual Production | 400,000 Pieces |
Production Hrs. Annual | 6,708 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $67,663 | 533,060 | kWh | $0.13 |
Electricity Demand | $8,241 | 2,161 | kW-months/year | $3.81 |
Electricity Fees | $20,576 | - | $ | - |
Natural Gas | $3,777 | 332 | MMBtu | $11.38 |
TOTAL ENERGY COSTS | $100,257 | |||
RECOMMENDED SAVINGS* | $76,206 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,392 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Primary Product | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $671 Cost: - |
- | - | - | - | $671 | - | - | - |
- - kWh |
- - kW-months/year |
$671 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,267 Cost: $1,927 |
$6,897 | 54,309 | $370 | 97 | - | - | - | - |
$6,897 54,309 kWh |
$370 97 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,461 Cost: $2,205 |
$6,187 | 48,718 | $274 | 72 | - | - | - | - |
$6,187 48,718 kWh |
$274 72 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $1,817 Cost: $1,200 |
$1,817 | 14,310 | - | - | - | - | - | - |
$1,817 14,310 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,717 Cost: $1,900 |
$520 | 4,090 | $1,197 | 314 | - | - | - | - |
$520 4,090 kWh |
$1,197 314 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,615 Cost: $3,540 |
$1,531 | 12,054 | $84 | 22 | - | - | - | - |
$1,531 12,054 kWh |
$84 22 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $728 Cost: $1,800 |
$690 | 5,431 | $38 | 10 | - | - | - | - |
$690 5,431 kWh |
$38 10 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $18,661 Cost: $48,235 |
$17,891 | 140,868 | $770 | 202 | - | - | - | - |
$17,891 140,868 kWh |
$770 202 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS |
Savings: $37,269 Cost: $125,000 |
- | - | - | - | - | - | $37,269 | - |
- - kWh |
- - kW-months/year |
- - $ |
$37,269 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $76,206 Cost: $185,807 |
$35,533 | 279,780 | $2,733 | 717 | $671 | - | $37,269 | - | $35,533 279,780 kWh |
$2,733 717 kW-months/year |
$671 - $ |
$37,269 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,392 Cost: $57,807 |
$33,026 | 260,039 | $2,695 | 707 | $671 | - | - | - | $33,026 260,039 kWh |
$2,695 707 kW-months/year |
$671 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Primary Product | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Primary Product |