IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2022
Principal Product Machined Parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 5
Plant Area (Sq.Ft.) 23,000
Annual Production 400,000 Pieces
Production Hrs. Annual 6,708
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,663 533,060 kWh $0.13
Electricity Demand $8,241 2,161 kW-months/year $3.81
Electricity Fees $20,576 - $ -
Natural Gas $3,777 332 MMBtu $11.38
TOTAL ENERGY COSTS $100,257
RECOMMENDED SAVINGS* $76,206 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,392
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$671
Cost:
-
- - - - $671 - - - -
-
kWh
-
-
kW-months/year
$671
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,267
Cost:
$1,927
$6,897 54,309 $370 97 - - - - $6,897
54,309
kWh
$370
97
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,461
Cost:
$2,205
$6,187 48,718 $274 72 - - - - $6,187
48,718
kWh
$274
72
kW-months/year
-
-
$
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,817
Cost:
$1,200
$1,817 14,310 - - - - - - $1,817
14,310
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,717
Cost:
$1,900
$520 4,090 $1,197 314 - - - - $520
4,090
kWh
$1,197
314
kW-months/year
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,615
Cost:
$3,540
$1,531 12,054 $84 22 - - - - $1,531
12,054
kWh
$84
22
kW-months/year
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$728
Cost:
$1,800
$690 5,431 $38 10 - - - - $690
5,431
kWh
$38
10
kW-months/year
-
-
$
-
-
$
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$18,661
Cost:
$48,235
$17,891 140,868 $770 202 - - - - $17,891
140,868
kWh
$770
202
kW-months/year
-
-
$
-
-
$
09: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS Savings:
$37,269
Cost:
$125,000
- - - - - - $37,269 - -
-
kWh
-
-
kW-months/year
-
-
$
$37,269
-
$
TOTAL RECOMMENDED Savings:
$76,206
Cost:
$185,807
$35,533 279,780 $2,733 717 $671 - $37,269 - $35,533
279,780
kWh
$2,733
717
kW-months/year
$671
-
$
$37,269
-
$
TOTAL IMPLEMENTED Savings:
$36,392
Cost:
$57,807
$33,026 260,039 $2,695 707 $671 - - - $33,026
260,039
kWh
$2,695
707
kW-months/year
$671
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Primary Product