IAC logo
IAC Assessment: LE0531
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0531
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2022
Principal Product SHIPS
NAICS 336611 - Ship Building and Repairing
SIC 3731 - Ship Building And Repairing
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 2,000,000
Annual Production 3 Pieces
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,956,196 18,840,339 kWh $0.10
Electricity Demand $64,975 48,116 kW-months/year $1.35
Electricity Fees $5,718 - $ -
TOTAL ENERGY COSTS $2,026,889
RECOMMENDED SAVINGS* $691,537 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$130,874
Cost:
$22,000
$124,590 1,197,988 $6,284 4,655 $124,590
1,197,988
kWh
$6,284
4,655
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$84,178
Cost:
$47,500
$78,314 753,021 $5,864 4,344 $78,314
753,021
kWh
$5,864
4,344
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$330,596
Cost:
$199,875
$324,805 3,123,120 $5,791 4,290 $324,805
3,123,120
kWh
$5,791
4,290
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$49,409
Cost:
$33,000
$48,546 466,792 $863 639 $48,546
466,792
kWh
$863
639
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,036
Cost:
$10,414
$7,746 74,481 $290 215 $7,746
74,481
kWh
$290
215
kW-months/year
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$88,444
Cost:
$135,000
$87,818 844,405 $626 464 $87,818
844,405
kWh
$626
464
kW-months/year
TOTAL RECOMMENDED Savings:
$691,537
Cost:
$447,789
$671,819 6,459,807 $19,718 14,607 $671,819
6,459,807
kWh
$19,718
14,607
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand