IAC Assessment: LE0534
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0534
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2022
Principal Product Sewage Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 1,200,000
Annual Production 28,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,419,135 17,622,865 kWh $0.08
Electricity Demand $141,414 33,494 kW-months/year $4.22
Electricity Fees $48,000 - $ -
Natural Gas $1,158,864 378,694 MMBtu $3.06
TOTAL ENERGY COSTS $2,767,413
RECOMMENDED SAVINGS* $702,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,351
Cost:
$8,500
$19,796 244,390 $7,555 1,790 - - - - $19,796
244,390
kWh
$7,555
1,790
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$201,245
Cost:
$160,000
$190,349 2,349,884 $10,896 2,582 - - - - $190,349
2,349,884
kWh
$10,896
2,582
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,191
Cost:
$15,400
$9,765 120,557 $426 101 - - - - $9,765
120,557
kWh
$426
101
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$358,386
Cost:
$550,000
$334,433 4,128,808 $23,953 5,676 - - - - $334,433
4,128,808
kWh
$23,953
5,676
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$10,899
Cost:
$50,000
$(-5,287) (-65,170) $(-380) (-89) $16,566 5,410 - - $(-5,287)
(-65,170)
kWh
$(-380)
(-89)
kW-months/year
$16,566
5,410
MMBtu
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$93,939
Cost:
$600,000
$22,644 279,552 $1,295 307 - - $70,000 - $22,644
279,552
kWh
$1,295
307
kW-months/year
-
-
MMBtu
$70,000
-
$
TOTAL RECOMMENDED Savings:
$702,011
Cost:
$1,383,900
$571,700 7,058,021 $43,745 10,367 $16,566 5,410 $70,000 - $571,700
7,058,021
kWh
$43,745
10,367
kW-months/year
$16,566
5,410
MMBtu
$70,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost