Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2022 |
Principal Product | Aluminium powder |
NAICS | 339999 - All Other Miscellaneous Manufacturing |
SIC | 3399 - Primary Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 39,000,000 Pounds |
Production Hrs. Annual | 8,756 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $499,143 | 9,132,300 | kWh | $0.05 |
Electricity Demand | $53,054 | 21,354 | kW-months/year | $2.48 |
Electricity Fees | $10,314 | - | $ | - |
Natural Gas | $355,109 | 78,328 | MMBtu | $4.53 |
TOTAL ENERGY COSTS | $917,620 | |||
RECOMMENDED SAVINGS* | $378,060 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Primary Product | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,826 Cost: $6,362 |
$8,204 | 149,167 | $622 | 251 | - | - | - | - | - | - |
$8,204 149,167 kWh |
$622 251 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $684 Cost: $780 |
$645 | 11,731 | $39 | 16 | - | - | - | - | - | - |
$645 11,731 kWh |
$39 16 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,728 Cost: $2,200 |
$1,629 | 29,617 | $99 | 40 | - | - | - | - | - | - |
$1,629 29,617 kWh |
$99 40 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $246,141 Cost: $750,000 |
- | - | - | - | $16,141 | 3,563 | $130,000 | - | $100,000 | - |
- - kWh |
- - kW-months/year |
$16,141 3,563 MMBtu |
$130,000 - $ |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $44,811 Cost: $140,000 |
- | - | - | - | $44,811 | 9,892 | - | - | - | - |
- - kWh |
- - kW-months/year |
$44,811 9,892 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $75,870 Cost: $448,000 |
$71,453 | 1,299,152 | $4,417 | 1,781 | - | - | - | - | - | - |
$71,453 1,299,152 kWh |
$4,417 1,781 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $378,060 Cost: $1,347,342 |
$81,931 | 1,489,667 | $5,177 | 2,088 | $60,952 | 13,455 | $130,000 | - | $100,000 | - | $81,931 1,489,667 kWh |
$5,177 2,088 kW-months/year |
$60,952 13,455 MMBtu |
$130,000 - $ |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Primary Product | By-product Production |